Permit: TR-ROW-0824-00916
Permit Details
Apply Date:
08/12/2024
Applicant:
Doone Baker
Description:
Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
Permit Reviews
Permit Number - TR-ROW-0824-00916
Permit Status: Issued
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already.
110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt
Permit update TCP revision: Extended hours - Start time 6:00 AM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/12/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/12/2024 | APPROVED |
08/15/2024 | RIGHT-OF-WAY REVIEW REVISION v.1 | 08/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0824-00916
Permit Status: Issued
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already.
110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt
Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
08/12/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
08/12/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
08/12/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
08/16/2024 | The following extended traffic control set-up times were approved: 6:00AM - 3:30PM |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0824-00916
Permite Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already.
110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt
Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
TRSP - ROW - Barricade - Setup/Routine | N/A | Requested | ||
TRSP - ROW - Barricade Takedown | N/A | Requested | ||
TRSP - ROW - Backfill - Placement/Compaction | N/A | Requested | ||
TRSP - ROW - Final | N/A | Requested |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0824-00916
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already.
110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt
Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |