Permit Details

Status:
Issued
Type:
Right-of-Way (ROW)
Apply Date:
08/12/2024
Applicant:
Doone Baker
Description:
Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM

Permit Reviews

Permit Number - TR-ROW-0824-00916
Permit Status: Issued
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
Start Date Submittal Complete Date Status  
08/12/2024 RIGHT-OF-WAY REVIEW v.1 08/12/2024 APPROVED Review Details
08/15/2024 RIGHT-OF-WAY REVIEW REVISION v.1 08/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0824-00916
Permit Status: Issued
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Outstanding Activity Conditions - 4
Date Name
08/12/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
08/12/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
08/12/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206
08/16/2024 The following extended traffic control set-up times were approved: 6:00AM - 3:30PM

Outstanding Inspections

Permit Status: Issued
Permit Number: TR-ROW-0824-00916
Permite Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
TRSP - ROW - Barricade Takedown N/A Requested
TRSP - ROW - Final N/A Requested

Completed Inspections

Permit Status: Issued
Permit Number: TR-ROW-0824-00916
Permit Description: Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/16/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/14/2024 TRSP - ROW - Barricade - Setup/Routine Passed
11/18/2024 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
TRAFFIC CONTROL HOURS REVISION LETTER - SEWER ROW_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
831 E LIMBERLOST DR - GOOGLE MAPS_V1.PDF DOCUMENTS VIEW
TRAFFIC CONTROL 831 LIMBERLOST_V1.PDF DOCUMENTS VIEW
_APPROVED SEWER P23SC00064_V1.PDF DOCUMENTS VIEW