Permit: TR-ROW-0823-01028
Permit Details
Apply Date:
08/02/2023
Applicant:
Ben Hager
Description:
**** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day.
Permit Reviews
Permit Number - TR-ROW-0823-01028
Permit Status: Issued
Permit Description: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be
testing and cameraing the (3) new manholes that were
installed this summer with Pima County.
Duration of the work will be the following days:
9/25/23 from 5AM to 3PM
9/29/23 from 5AM to 3PM
10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day
12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise
12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise.
01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on
the following day.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/20/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/15/2023 | APPROVED |
09/15/2023 | RIGHT-OF-WAY REVIEW v.2 | 09/20/2023 | APPROVED |
08/02/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/07/2023 | APPROVED |
09/28/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/04/2023 | APPROVED |
08/08/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/09/2023 | APPROVED |
11/20/2023 | RIGHT-OF-WAY REVIEW v.1 | 11/21/2023 | APPROVED |
10/06/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2023 | APPROVED |
12/14/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/15/2023 | APPROVED |
01/02/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/02/2024 | APPROVED |
09/12/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/15/2023 | REQUIRES RESUBMIT |
01/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/11/2024 | REQUIRES RESUBMIT |
12/06/2023 | RIGHT-OF-WAY REVIEW v.1 | 12/06/2023 | APPROVED |
09/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 09/06/2023 | APPROVED |
08/16/2023 | RIGHT-OF-WAY REVIEW v.1 | 08/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0823-01028
Permit Status: Issued
Permit Description: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be
testing and cameraing the (3) new manholes that were
installed this summer with Pima County.
Duration of the work will be the following days:
9/25/23 from 5AM to 3PM
9/29/23 from 5AM to 3PM
10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day
12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise
12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise.
01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on
the following day.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
08/02/2023 | The following extended traffic control set-up times were approved: |
08/02/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0823-01028
Permite Description: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be
testing and cameraing the (3) new manholes that were
installed this summer with Pima County.
Duration of the work will be the following days:
9/25/23 from 5AM to 3PM
9/29/23 from 5AM to 3PM
10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day
12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise
12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise.
01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on
the following day.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0823-01028
Permit Description: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be
testing and cameraing the (3) new manholes that were
installed this summer with Pima County.
Duration of the work will be the following days:
9/25/23 from 5AM to 3PM
9/29/23 from 5AM to 3PM
10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day
12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise
12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise.
01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on
the following day.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |