Permit: TR-ROW-0726-00858
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address:
2406 E COPPER ST
Address NEW:
2406 E COPPER ST
Apply Date:
07/27/2026
Applicant:
Chad Williams
Description:
NEW SIDEWALK AND APRON ON COPPER ST SIDEWALK TO NORTON APRON IS PROPOSED AS 20 FEET WIDE WITH 2 2FT. 6 WINGS FOR A TOTAL OF 25 FT
Permit Reviews
Permit Number - TR-ROW-0726-00858
Permit Status: Needs resubmittal
Permit Description: NEW SIDEWALK AND APRON ON COPPER ST SIDEWALK TO NORTON APRON IS PROPOSED AS 20 FEET WIDE WITH 2 2FT. 6 WINGS FOR A TOTAL OF 25 FT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/03/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | REQUIRES RESUBMIT |
| 07/29/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0726-00858
Permit Status: Needs resubmittal
Permit Description: NEW SIDEWALK AND APRON ON COPPER ST SIDEWALK TO NORTON APRON IS PROPOSED AS 20 FEET WIDE WITH 2 2FT. 6 WINGS FOR A TOTAL OF 25 FT
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/29/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 07/29/2026 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 07/29/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 07/29/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 07/29/2026 | PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206 |