Permit: TR-ROW-0625-00789
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
5344 S ALVERNON WY
Address NEW:
5344 S ALVERNON WY
Apply Date:
06/10/2025
Applicant:
ANGEL MORALES
Description:
Install water line in right of way 170’L X 16’W X 6’D. 24hr shoulder closure. 5370 S ALVERNON WAY *** 7/10- RENEWAL FOR 60 DAYS AS OF 7/14/25
Permit Reviews
Permit Number - TR-ROW-0625-00789
Permit Status: Inspections
Permit Description: Install water line in right of way 170’L X 16’W X 6’D. 24hr shoulder closure.
5370 S ALVERNON WAY ***
7/10- RENEWAL FOR 60 DAYS AS OF 7/14/25
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00789
Permit Status: Inspections
Permit Description: Install water line in right of way 170’L X 16’W X 6’D. 24hr shoulder closure.
5370 S ALVERNON WAY ***
7/10- RENEWAL FOR 60 DAYS AS OF 7/14/25
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/10/2025 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 06/10/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/10/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/11/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0625-00789
Permite Description: Install water line in right of way 170’L X 16’W X 6’D. 24hr shoulder closure.
5370 S ALVERNON WAY ***
7/10- RENEWAL FOR 60 DAYS AS OF 7/14/25
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2025 | TRSP - ROW - Final | N/A | Re-inspection required | Work is not complete. Still a plated trench across Concord St |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0625-00789
Permit Description: Install water line in right of way 170’L X 16’W X 6’D. 24hr shoulder closure.
5370 S ALVERNON WAY ***
7/10- RENEWAL FOR 60 DAYS AS OF 7/14/25
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/15/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is in progress and nearing completion, but no pre-activity meeting was ever held | |
| 09/25/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Backfilled with AB with compaction texting being performed by a third party. I asked for the compaction tests to be emailed to me so I can add them to the final inspection. Will mentioned that pavement patch will be sometime around Wednesday of next week 10/01/25 |