Permit: TR-ROW-0625-00772
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8800 E SPEEDWAY BL
Address NEW:
8800 E SPEEDWAY BL
Apply Date:
06/05/2025
Applicant:
Andrew Ruiz
Description:
Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Permit Reviews
Permit Number - TR-ROW-0625-00772
Permit Status: Complete
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0625-00772
Permit Status: Complete
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/06/2025 | The following extended traffic control set-up times were approved: |
| 06/06/2025 | BUS STOP/ ROUTE |
| 06/06/2025 | DRIVEWAY |
| 06/06/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 06/06/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0625-00772
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/11/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/11/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/11/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 08/26/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 09/22/2025 | TRSP - ROW - Final | Passed |