Permit: TR-ROW-0526-00559
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4874 S MOUNTAIN AV
Address NEW:
4874 S MOUNTAIN AV
Apply Date:
05/08/2026
Applicant:
Christine christine@customsawcuts.com
Description:
This project involves cutting and removing a portion of the existing sidewalk and/or curb to create a driveway apron. The new apron will provide a smooth, safe transition from the street into the driveway. **DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED*** 06/25/26-New driveway apron mesurements are send for revision. 07/02/26- revision resend for pack standard on driveway. 07/06/26- Renew permit for 30 days as of 07/04/26, new expiration date is 08/03/26.
Permit Reviews
Permit Number - TR-ROW-0526-00559
Permit Status: Complete
Permit Description: This project involves cutting and removing a portion of the existing sidewalk and/or curb to create a driveway apron. The new apron will provide a smooth, safe transition from the street into the driveway.
**DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
06/25/26-New driveway apron mesurements are send for revision.
07/02/26- revision resend for pack standard on driveway.
07/06/26- Renew permit for 30 days as of 07/04/26, new expiration date is 08/03/26.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/24/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/29/2026 | APPROVED |
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/01/2026 | APPROVED |
| 05/08/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | REQUIRES RESUBMIT |
| 07/01/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 07/07/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0526-00559
Permit Status: Complete
Permit Description: This project involves cutting and removing a portion of the existing sidewalk and/or curb to create a driveway apron. The new apron will provide a smooth, safe transition from the street into the driveway.
**DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
06/25/26-New driveway apron mesurements are send for revision.
07/02/26- revision resend for pack standard on driveway.
07/06/26- Renew permit for 30 days as of 07/04/26, new expiration date is 08/03/26.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/12/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/12/2026 | Install Driveway Apron Per PAG SD 206 |
| 05/12/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0526-00559
Permit Description: This project involves cutting and removing a portion of the existing sidewalk and/or curb to create a driveway apron. The new apron will provide a smooth, safe transition from the street into the driveway.
**DENIED NO PRE-ACTIVITY FIELD MEETING HAS BEEN SCHEDULED***
06/25/26-New driveway apron mesurements are send for revision.
07/02/26- revision resend for pack standard on driveway.
07/06/26- Renew permit for 30 days as of 07/04/26, new expiration date is 08/03/26.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/17/2026 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/20/2026 | TRSP - ROW - Final | Passed |