Permit: TR-ROW-0525-00722
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
5205 E VALENCIA RD
Address NEW:
5205 E VALENCIA RD
Apply Date:
05/22/2025
Applicant:
Dave Damitio
Description:
Create 2 driveways - one on Valencia Road and one on Valencia Crossing
Permit Reviews
Permit Number - TR-ROW-0525-00722
Permit Status: Inspections
Permit Description: Create 2 driveways - one on Valencia Road and one on Valencia Crossing
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/27/2025 | REQUIRES RESUBMIT |
| 05/28/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00722
Permit Status: Inspections
Permit Description: Create 2 driveways - one on Valencia Road and one on Valencia Crossing
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/23/2025 | DRIVEWAY |
| 05/23/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/23/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/28/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/28/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0525-00722
Permit Description: Create 2 driveways - one on Valencia Road and one on Valencia Crossing
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | met on site with Ed, the general contractor, with desert, barricade, and with desert Earth contracting. We discussed extending work hours to begin at 5 AM. We discussed concrete being used to be 2500 psi and we discussed traffic control and not maintaining pedestrian access on the east side due to full access on the west side for pedestrians and bicycles. | |
| 06/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Following the approved TCP | |
| 06/13/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Approved to pour curb | |
| 09/09/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | The compaction of all the native materials were the sidewalk and curb replaced on, meet the minimum requirement of 95% | |
| 09/10/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | sidewalk and curb work has been completed | |
| 12/01/2025 | TRSP - ROW - Final | Passed | Sidewalk, ADA ramps, and driveway aprons are built to city of Tucson standards. Work is complete |