Permit: TR-ROW-0525-00586
Permit Details
Apply Date:
05/01/2025
Applicant:
Andres Amado
Description:
Neighborhood waterline rehabilitation including all new waterlines, services, private plumbing's, hydrants and asphalt patch Permit update 8/21/2025: Renewal request for 90 days as of 9/7/2025.
Permit Reviews
Permit Number - TR-ROW-0525-00586
Permit Status: Complete
Permit Description: Neighborhood waterline rehabilitation including all new waterlines, services, private plumbing's, hydrants and asphalt patch
Permit update 8/21/2025: Renewal request for 90 days as of 9/7/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/07/2025 | REQUIRES RESUBMIT |
| 05/12/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/14/2025 | REQUIRES RESUBMIT |
| 05/14/2025 | RIGHT-OF-WAY REVIEW v.3 | 05/20/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00586
Permit Status: Complete
Permit Description: Neighborhood waterline rehabilitation including all new waterlines, services, private plumbing's, hydrants and asphalt patch
Permit update 8/21/2025: Renewal request for 90 days as of 9/7/2025.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/02/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/02/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00586
Permite Description: Neighborhood waterline rehabilitation including all new waterlines, services, private plumbing's, hydrants and asphalt patch
Permit update 8/21/2025: Renewal request for 90 days as of 9/7/2025.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Underground work is complete, temporary patches are in place, waiting on final pavement repair. Some saw cutting and removal of cold mix has occurred, permanent patches should be coming soon. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00586
Permit Description: Neighborhood waterline rehabilitation including all new waterlines, services, private plumbing's, hydrants and asphalt patch
Permit update 8/21/2025: Renewal request for 90 days as of 9/7/2025.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I met on site with Andres from action pipeline and he informed me that work will begin around 15 September after a pre-con with Tucson water and utility locates. There has already been a community meeting so residents have been informed of the project. Neighborhood is not under moratorium status so typical patching will be sufficient. Permit is about to expire and a renewal has already been approved. | |
| 08/28/2025 | TRSP - ROW - SITE INSPECTION | Passed | Pre-construction meeting for San Paulo Village MR PH II B with City of Tucson water and Action Pipeline at Harriet Johnson Park. | |
| 12/02/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Backfill and temporary patch portion of work has been completed | |
| 08/04/2026 | TRSP - ROW - Final | Passed | Work is complete |