| 08/22/2025 |
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting |
|
Passed |
I met on site with Andres from action pipeline and he informed me that work will begin around 15 September after a pre-con with Tucson water and utility locates. There has already been a community meeting so residents have been informed of the project. Neighborhood is not under moratorium status so typical patching will be sufficient. Permit is about to expire and a renewal has already been approved. |