Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0524-00547
Permit Details
Apply Date:
05/08/2024
Applicant:
Eric Horne
Description:
Creating ADA ramps on existing sidewalk, trenching water and electrical to new facility. 90 day permit request
Permit Reviews
Permit Number - TR-ROW-0524-00547
Permit Status: Complete
Permit Description: Creating ADA ramps on existing sidewalk, trenching water and electrical to new facility.
90 day permit request
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0524-00547
Permit Status: Complete
Permit Description: Creating ADA ramps on existing sidewalk, trenching water and electrical to new facility.
90 day permit request
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
05/08/2024 | Traffic control set-up approved between 9AM - 3:30PM |
05/08/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
05/08/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0524-00547
Permit Description: Creating ADA ramps on existing sidewalk, trenching water and electrical to new facility.
90 day permit request
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/25/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
06/25/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/27/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
08/27/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
11/01/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
11/27/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
11/27/2024 | TRSP - ROW - Final/Close-Out | Passed |