Permit: TR-ROW-0426-00456
Permit Details
Apply Date:
04/21/2026
Applicant:
Christian Celaya
Description:
The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.
Permit Reviews
Permit Number - TR-ROW-0426-00456
Permit Status: In review
Permit Description: The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 05/11/2026 | REQUIRES RESUBMIT |
| 05/11/2026 | RIGHT-OF-WAY REVIEW v.4 | N/A | IN REVIEW |
| 04/28/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/29/2026 | REQUIRES RESUBMIT |
| 04/21/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/27/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00456
Permit Status: In review
Permit Description: The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.
Total Outstanding Activity Conditions - 12
| Date | Name |
|---|---|
| 04/22/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/22/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/22/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/12/2026 | The contractor shall always maintain safe and continuous access to all adjacent businesses during construction. |
| 05/12/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/12/2026 | The following extended traffic control set-up times were approved: Approved for 24 hr closure |
| 05/12/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/12/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/12/2026 | The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 05/12/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |