Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
405 E WETMORE RD
Address NEW:
405 E WETMORE RD
Apply Date:
04/21/2026
Applicant:
Christian Celaya
Description:
The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.

Permit Reviews

Permit Number - TR-ROW-0426-00456
Permit Status: In review
Permit Description: The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.
Start Date Submittal Complete Date Status  
05/06/2026 RIGHT-OF-WAY REVIEW v.3 05/11/2026 REQUIRES RESUBMIT Review Details
05/11/2026 RIGHT-OF-WAY REVIEW v.4 N/A IN REVIEW Review Details
04/28/2026 RIGHT-OF-WAY REVIEW v.2 04/29/2026 REQUIRES RESUBMIT Review Details
04/21/2026 RIGHT-OF-WAY REVIEW v.1 04/27/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00456
Permit Status: In review
Permit Description: The contractor will be installing a New Hawk Signal and will be trenching across Wetmore Road for Joseph Adornetto for (ESI) Engineered Structures, Inc.
Total Outstanding Activity Conditions - 12
Date Name
04/22/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/22/2026 Traffic control set-up approved between 9AM - 3:30PM
04/22/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/22/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/22/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/12/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses during construction.
05/12/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/12/2026 The following extended traffic control set-up times were approved: Approved for 24 hr closure
05/12/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/12/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/12/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
05/12/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14