Permit: TR-ROW-0425-00484
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8800 E SPEEDWAY BL
Address NEW:
8800 E SPEEDWAY BL
Apply Date:
04/10/2025
Applicant:
ANGEL MORALES
Description:
This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel. Permit update 4/22/2025 - The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffic at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffic later with a separate plan.
Permit Reviews
Permit Number - TR-ROW-0425-00484
Permit Status: Complete
Permit Description: This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel.
Permit update 4/22/2025 - The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffic at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffic later with a separate plan.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2025 | RIGHT-OF-WAY REVIEW v.2 | 04/23/2025 | APPROVED |
| 04/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/18/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0425-00484
Permit Status: Complete
Permit Description: This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel.
Permit update 4/22/2025 - The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffic at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffic later with a separate plan.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/16/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/16/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/16/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/23/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 04/23/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0425-00484
Permit Description: This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel.
Permit update 4/22/2025 - The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffic at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffic later with a separate plan.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/26/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/30/2025 | TRSP - ROW - Final | Passed |