Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1801 N STONE AV
Apply Date:
04/19/2024
Applicant:
Andrew Ruiz
Description:
Installation on a new 4" sewer and tie into the sewer main on Stone. Approve plans attached. Updated - 6/12/2024 - Request for 90 day Extension of Permit as of 6/05/2024, And Addition of Flood Plan permit requirements..

Permit Reviews

Permit Number - TR-ROW-0424-00433
Permit Status: Complete
Permit Description: Installation on a new 4" sewer and tie into the sewer main on Stone. Approve plans attached. Updated - 6/12/2024 - Request for 90 day Extension of Permit as of 6/05/2024, And Addition of Flood Plan permit requirements..
Start Date Submittal Complete Date Status  
05/01/2024 RIGHT-OF-WAY REVIEW v.2 05/02/2024 APPROVED Review Details
04/19/2024 RIGHT-OF-WAY REVIEW v.1 04/25/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0424-00433
Permit Status: Complete
Permit Description: Installation on a new 4" sewer and tie into the sewer main on Stone. Approve plans attached. Updated - 6/12/2024 - Request for 90 day Extension of Permit as of 6/05/2024, And Addition of Flood Plan permit requirements..
Total Outstanding Activity Conditions - 5
Date Name
04/22/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/22/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
04/22/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206
04/22/2024 Traffic/Mobility Control Plan (MCP) approved as submitted.
06/12/2024 1) Temporary sewer line shall be completely removed from the Bronx W.A.S.H. floodplain prior to final inspections. Email Angel Flores at stormwater@tucsonaz.gov az.gov to schedule an inspection. 2) Prior to commencement of work for this project, a copy of the approved Pima County wastewater permit must be submitted to City of Tucson Engineering Division at TucsonErosionHazardInfo@tucsonaz.gov 3) Copy of as-builts are required, submit to City of Tucson Engineering Division at TucsonErosionHazardInfo@tucsonaz.gov

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0424-00433
Permit Description: Installation on a new 4" sewer and tie into the sewer main on Stone. Approve plans attached. Updated - 6/12/2024 - Request for 90 day Extension of Permit as of 6/05/2024, And Addition of Flood Plan permit requirements..
Total Completed Inspections - 8

Documents

File Name Document Type  
COMMENT RESPONSE TCP BJ'S_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P23WP00120 CONSTRUCTION PERMIT PLANS_V1.PDF DOCUMENTS VIEW
SIERRALAND REVISED TRAFFIC PLANS BJ_V2.PDF DOCUMENTS VIEW