Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
2501 E HEDRICK DR
Apply Date:
03/07/2025
Applicant:
Arthur Mehler
Description:
AZTEC will pothole 17 locations on residential streets for the design of a new water line.

Permit Reviews

Permit Number - TR-ROW-0325-00320
Permit Status: Complete
Permit Description: AZTEC will pothole 17 locations on residential streets for the design of a new water line.
Start Date Submittal Complete Date Status  
03/13/2025 RIGHT-OF-WAY REVIEW v.2 03/17/2025 REQUIRES RESUBMIT Review Details
03/19/2025 RIGHT-OF-WAY REVIEW v.4 03/19/2025 APPROVED Review Details
03/17/2025 RIGHT-OF-WAY REVIEW v.3 03/18/2025 REQUIRES RESUBMIT Review Details
03/07/2025 RIGHT-OF-WAY REVIEW v.1 03/11/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0325-00320
Permit Status: Complete
Permit Description: AZTEC will pothole 17 locations on residential streets for the design of a new water line.
Total Outstanding Activity Conditions - 5
Date Name
03/10/2025 Traffic control set-up approved between 9AM - 3:30PM
03/10/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
03/19/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
03/19/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE.
03/19/2025 Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0325-00320
Permit Description: AZTEC will pothole 17 locations on residential streets for the design of a new water line.
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/01/2025 TRSP - ROW - Barricade Takedown Passed
04/01/2025 TRSP - ROW - Barricade - Setup/Routine Passed
04/23/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
04/23/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
BINDER1_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LA MADERA PH5 TCPS_V1.PDF DOCUMENTS VIEW
25-0042B_V1.PDF DOCUMENTS VIEW
25-0042C_V1.PDF DOCUMENTS VIEW
25-0042_V1.PDF DOCUMENTS VIEW
BINDER1_V1 - STAMPED.PDF DOCUMENTS VIEW
PRJ000212 POTHOLES_V1.PDF DOCUMENTS VIEW