Permit: TR-ROW-0324-00351
Permit Details
Apply Date:
03/31/2024
Applicant:
Armando Bracamonte
Description:
Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd. Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
Permit Reviews
Permit Number - TR-ROW-0324-00351
Permit Status: Issued
Permit Description: Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd.
Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/28/2024 | APPROVED |
04/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/03/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0324-00351
Permit Status: Issued
Permit Description: Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd.
Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/02/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
04/02/2024 | The following extended traffic control set-up times were approved: |
04/02/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
04/02/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
04/02/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0324-00351
Permite Description: Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd.
Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/03/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0324-00351
Permit Description: Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd.
Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/18/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
07/03/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |