Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel133243710
JurisdictionTucson
City of Tucson ZoningC-1
Tucson WardWard 2
Tucson Registered NeighborhoodCarriage Park
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Historic Records Requests - (1)
Name Action
Address: 7945 E BROADWAY BL - Doc Type: CERT OF OCC VIEW

Annexations & Original City Zoning (OCZ)

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-69-66 Carriage Hill 3301 3385

Rezoning Cases

Date - 01/15/2025 9:43 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-72-07 Carriage Hill Annexation Zoning Correction B-1 Effectuated 08/03/2011

Special Development Requests & Requirements

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000002697 CLOSED 06/21/2010 N/A Historical Information

Permits

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Permits - (39)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1223-01483 Needs Resubmittal 12/27/2023 N/A Right-of-Way (ROW) Repair of Sidewalk section along WB Broadway Blvd @ Pantano Rd - Sidewalk within City of Tucson Right of Way, work being perform in response to City of Tucson DTM Street & Traffic inspection NOV
TR-UTL-1122-00292 Complete 11/17/2022 04/05/2023 Right-of-Way (ROW) - Utility PRJ195572-1 UNDER ORGINAL PERMIT T22RW03565 COX TO OVERLASH 448' OF AERIAL , TRENCH 87 ' AND BORE 2042 5' TO INSTALL NEW CATV
TR-ROW-1024-01233 Inspections 10/21/2024 11/22/2024 Right-of-Way (ROW) **CONTINUATION OF TR-UTL-0624-01160** Dirt Trench 2209 ft, Trench/Bore driveways 474 ft on east side of Pantano Rd. Place 2" conduit for First Digital fiber
TR-ROW-1023-01270 Issued 10/17/2023 07/01/2024 Right-of-Way (ROW) Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting Updated 3/28/2024 - Revision Request for 6am - 6 pm work hours - Per Originally approved Traffic Control plans on 12/14/2023.
T22RW03635 Complete 10/05/2022 02/15/2023 Right-of-Way (ROW) COX TO OVERLASH 421 OF AERIAL FIBER, TRENCH 16' AND BORE 830' TO INSTALL NEW CATV CONDUIT; Work Order: PRJ95572-6
T22RW03565 Needs Resubmittal 09/30/2022 N/A Right-of-Way (ROW) WO# PRJ195572-12 COX TO OVERLASH 448' OF AERIAL FIBER, TRENCH 87' AND BORE 2042 ' TO INSTALL NEW; Work Order: PRJ195572-12
TR-UTL-0624-01160 Complete 06/18/2024 10/19/2024 Right-of-Way (ROW) - Utility Dirt trench 2209 ft Trench/bore driveways 474 ft on east side of Pantano Rd. Place 2 " conduit for First Digital fiber
T21RW02837 Complete 06/11/2021 01/08/2023 Right-of-Way (ROW) POTHOLE 9 LOCATIONS IN DIRT (4' WIDE HOLES); Work Order: 6339123
TR-UTL-0523-01441 Complete 05/03/2023 09/11/2023 Right-of-Way (ROW) - Utility original permit TR-UTL-1122-00292 COX TO OVERLASH 448' OF AERIAL , TRENCH 87 ' AND BORE 2042 ' TO INSTALL NEW CATV
TR-ROW-0324-00351 Issued 03/31/2024 10/04/2024 Right-of-Way (ROW) Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd. Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
TR-ROW-0324-00247 Complete 03/04/2024 04/14/2024 Right-of-Way (ROW) Overlash 960 ft of fiber cable from 7945 E Broadway to 200 S Pantano Rd for First Digital
TR-UTL-0224-00372 Void 02/23/2024 N/A Right-of-Way (ROW) - Utility Overlash 960 ft of fiber cable from 7945 E Broadway to 200 S Pantano Rd for First Digital
TR-UTL-0224-00282 Withdrawn 02/09/2024 N/A Right-of-Way (ROW) - Utility Lash 990 ft to to existing power poles for First Digital - (4th St to 200 S Pantano Rd - Southbound)
TR-UTL-0224-00273 Void 02/08/2024 N/A Right-of-Way (ROW) - Utility (Denied - Work Area Exceeds the Maximum Distance of 5280 ft on a Single Permit Request) Lash 5320 ft of fiber cable to existing power poles, trench/bore 258 ft place 2" conduit for first digital
TR-UTL-0223-00806 Complete 02/07/2023 06/28/2023 Right-of-Way (ROW) - Utility Original Permit T22RW03635 : COX TO OVERLASH 421 OF AERIAL FIBER, TRENCH 16' AND BORE 830' TO INSTALL NEW CATV CONDUIT
T22FC00078 Expired 01/28/2022 08/14/2022 Fire Construction Permit Fire Alarm & Detection Systems - AAA Smart Home to replace existing fire communicator 3G with a new 4G fire radio communicator. All existing devices to remain as is.; Fire Alarm Systems - Monitoring Modification
T01BU02430 WITHDRWN 08/21/2001 N/A BUILD REPLACE:ROOF TO ATRIUM
T01BU03265 EXPIRED 11/16/2001 05/15/2002 TENTS TENT:CANOPY TREE LOT
T02BU00117 FINAL 01/16/2002 09/22/2002 BUILD REPLACE:ROOF
T03AN00460 ISSUED 05/02/2003 N/A ADDRNEW
T03BU02998 EXPIRED 11/21/2003 05/19/2004 TENTS TENT:TREE LOT
T06CM02685 FINAL 05/05/2006 11/01/2006 COMBO GEN REPAIR: ELECTRIC
T06EL00282 FINAL 02/10/2006 08/09/2006 ELECT REPAIR WIRES UNDERNEATH GRILL (APA)
T15TC00448 FINAL 02/06/2015 N/A BARRICAD NEED TO CHECK MANHOLE FOR LEAKS
T16BU00891 FINAL 06/13/2016 09/10/2017 BUILD FIRE ALARM
T16CM06613 EXPIRED 08/26/2016 04/26/2017 COMBO TI: FACADE AND RESTROOM REMODELS
T16OT01181 EXPIRED 09/26/2016 03/25/2017 SIGN 3 -ILLUM WALL SIGNS
T17FO00312 FINAL 04/12/2017 08/23/2021 FIREOPER IHOP - OCC: 265
T17RW02425 FINAL 06/07/2017 08/04/2018 ROW START POINT FROM THE TEP POLE ON THE N SIDE OF E BROADWAY BLVD AND S PANTANO RD BEGIN 192' OVERLASH HEADING EAST CROSSING N PANTANO RD RISER DOWN BEGIN 175' TRENCH/BORE HEADING NORTH ON PANTANO RD 3 X 3 POTHOLE AND PLACE COX PEDESTAL HEAD 35' EAST TO OUR OF ROW
T18FO00915 FINAL 10/19/2018 N/A FIREOPER Install Co2 Alarm System for Bulk CO2
T19FC00008 FINAL 01/03/2019 10/15/2019 FIRECONS SAFEGUARD TO INSTALL FIRE ALARM CONTROL PANEL TO MONITOR CO2 SENSOR.
T19FC00163 VOID 03/04/2019 N/A FIRECONS 12.16.16 GREEN TAG WAS ISSUED FOR NOTIFIER SFP-5UD ON ORIGINAL INSTALL. 2019 A NOTIFIER SFP-10UD BEING INSTALL TO ACCOMMODATE ADDITIONAL ZONE REQUIREMENTS FOR TIE INTO THE SUB CO CONTROLLER.
T19FC00415 FINAL 05/31/2019 12/03/2019 FIRECONS MODIFY EXISTING FIRE SPRINKLER SYSTEM.
T20RW05555 FINAL 10/12/2020 11/14/2020 ROW JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REWIRE TRAFFIC SIGNAL AT ALL FOUR CORNERS OF BROADWAY BL/PANTANO RD. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 48-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS.
T20RW05647 FINAL 10/15/2020 01/19/2021 ROW WORK ORDER: N-758586-1, AT CORNER OF N. PANTANO RD AND E. BROADWAY BLVD ACCESS MH 4359 FOR SPLICING WORK ON EXISTING CABLE. TEMPORARY RELOCATION OF BUS STOP FROM EAST OF INTERSECTION TO WEST OF INTERSECTION. FROM THANKSGIVING DAY TO JANUARY 2, 2021 BROADWAY BL IS UNDER HOLIDAY RESTRICTIONS. THE BUS LANE SHALL REOPEN PRIOR TO THANKSGIVING DAY AND REMAIN OPEN UNTIL JANUARY 2, 2021. BLUE BUSINESS ACCESS SHALL BE PLACED AT THE ENTRANCE TO ALL BUSINESS INGRESS/EGRESS
T21FO00019 VOID 01/12/2021 01/12/2022 FIREOPER IHOP 1515
T21RW01925 FINAL 04/22/2021 06/21/2021 ROW Part 1: From the TEP pole SE corner of 7945 E Broadway Blvd , begin 760' removing of aerial cable heading south to TEP pole. Part 2: From the Cox vault, at SE corner of 7945 E Broadway Blvd, begin 170' trench/bore heading South, placing 6-2'' conduit and 144ct fiber, heading South. Place 3x3 pothole and new COX ped/vault. Continue 228' trench/vault heading South. Continue East 30' trench/bore and place new COX vault. Tie in. Continue 30' trench/bore heading West . Continue 405' trench/bore heading South, place 3x3 pothole and place new COX Vault, 7' trench/ bore to TEP pole and riser up. Begin 464' aerial overlash adding 144ct fiber heading East to TEP pole, tie in TPD point control shall be provided for the Broadway Blvd aerial crossing. Proof of notification is required at the time of the preconstruction meeting.
T21RW02641 FINAL 05/28/2021 09/02/2021 ROW N.831091-1- ALONG E. BROADWAY BLVD ACCESS MH 4359 AND MH 4965 TO SPLICE NEW CABLE AND PLACE IN EXISTING DUCT. ADDRESS ON APPLICATION: 8315 E BROADWAY BL PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
T21RW04202 FINAL 09/10/2021 11/30/2021 ROW JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REWIRING THE INTERSECTION OF PANTANO RD AND BROADWAY BL AND NEW CONDUITS WILL BE BORED. MESSAGE BOARDS WILL BE PLACED 3 DAYS PRIOR TO START OF WORK. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Plans

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
T17PI00002 Approved 01/03/2017 07/03/2017 -- Private Improvement Agreement PANTANO RD., BROADWAY BL TO 22ND ST

Record Requests

Address: 7945 E BROADWAY BL
Date - 01/15/2025 9:43 a.m.
Total Number Of Requests - (12)
Request Number Status Request Date Completed Date Type Description
REQ-0224-01505 Complete 02/23/2024 02/23/2024 Requests Lash 990 ft to to existing power poles for First Digital - (4th St to 200 S Pantano Rd - Southbound)
REQ-0324-02411 Denied 03/26/2024 N/A Requests (Denied - NO PRE-ACTIVITY MEETING HELD OR SCHEDULED FOR WORK AREA, Schedule pre-activity meeting and re-apply for Extension Prior to Expiration Date..) -- 90 day permit. Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curves to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
REQ-0324-02510 Complete 03/31/2024 04/01/2024 Requests 90 DAY PERMIT RNEWAL RQ Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curves to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting Updated 3/28/2024 - Revision Request for 6am - 6 pm work hours - Per Originally approved Traffic Control plans on 12/14/2023.
REQ-0423-02283 Denied 04/21/2023 N/A Requests PRJ195572-1 UNDER ORGINAL PERMIT T22RW03565 COX TO OVERLASH 448' OF AERIAL , TRENCH 87 ' AND BORE 2042 5' TO INSTALL NEW CATV - DENIED DUE TO NO PRECONSTRUCTION MEETING SCHEDULED.
REQ-0624-04608 Complete 06/27/2024 06/27/2024 Requests RENEW FOR 90 DAYS Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd. Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
REQ-0823-04188 Complete 08/02/2023 08/02/2023 Requests original permit TR-UTL-1122-00292 COX TO OVERLASH 448' OF AERIAL , TRENCH 87 ' AND BORE 2042 ' TO INSTALL NEW CATV
REQ-0924-06239 Denied 09/16/2024 N/A Requests **DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD **Dirt trench 2209 ft Trench/bore driveways 474 ft on east side of Pantano Rd. Place 2 " conduit for First Digital fiber
REQ-0924-06345 Approved 09/19/2024 09/19/2024 Requests **30 Day Extension***Dirt trench 2209 ft Trench/bore driveways 474 ft on east side of Pantano Rd. Place 2 " conduit for First Digital fiber
REQ-1024-06702 Denied 10/01/2024 10/01/2024 Requests ** DENIED- ONLY ONE RENEWAL ALLOWED PER PERMIT. PLEASE APPLY FOR A NEW PERMIT REFERENCING "CONTINUATION OF TR-ROW-0324-00351"** 60 day Renewal Extension Request. Updated - 5/23/2024 - Revision - Traffic Control. Addition of Traffic Control and 24 hr. Pedestrian detour Route on Westbound side of Broadway Blvd. Continuation of PERMIT TR-ROW-1023-01270 --- TCP PERMIT REQUEST FOR HOURS 6:00AM TO 6:00PM - Contractor will completely be modifying the intersection for COT DOT Armando Bracamonte. The work includes modifying the ramps and curbs to ADA standards. Obliterate pavement markings, pavement markings thermoplastic. Install new post and foundation for signing, trenching and boring across the intersection to install new pvc conduit, remove the old traffic signal poles and traffic signals and install new ones (upgrade). Walkways for pedestrians will be available and the contractor will have a flagman on site at all times to help cross pedestrians. Message boards will be displayed 3 days prior to work starting
REQ-1024-07049 Denied 10/16/2024 N/A Requests *Please re-apply for a new permit if work still needs to be done. Only allowing 1 renewal per permit. 2nd request has been denied.* Dirt trench 2209 ft Trench/bore driveways 474 ft on east side of Pantano Rd. Place 2 " conduit for First Digital fiber
REQ-1124-08000 Denied 11/22/2024 11/25/2024 Requests Denied due to TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Week of Thanksgiving Nov 25th 2024 to January 02, 2025. Submit a new permit to start after January 2, 2025. **CONTINUATION OF TR-UTL-0624-01160** Dirt Trench 2209 ft, Trench/Bore driveways 474 ft on east side of Pantano Rd. Place 2" conduit for First Digital fiber
REQ-1222-00559 Complete 12/30/2022 01/06/2023 Requests COX TO OVERLASH 421 OF AERIAL FIBER, TRENCH 16' AND BORE 830' TO INSTALL NEW CATV CONDUIT; Work Order: PRJ95572-6