Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
6523 E ESCALANTE RD
Apply Date:
03/12/2024
Applicant:
Cynthia Smith
Description:
TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.

Permit Reviews

Permit Number - TR-ROW-0324-00277
Permit Status: Complete
Permit Description: TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
Start Date Submittal Complete Date Status  
03/12/2024 RIGHT-OF-WAY REVIEW v.1 03/22/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0324-00277
Permit Status: Complete
Permit Description: TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
Total Outstanding Activity Conditions - 3
Date Name
03/13/2024 The following extended traffic control set-up times were approved:
03/13/2024 Traffic control set-up approved between 9AM - 3:30PM
03/22/2024 Bike Route (Multi use path)

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0324-00277
Permit Description: TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/02/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed site ongoing. discussed swppp practices for monsoon. wants to extend permit to 7-18-2024 to complete work.
08/06/2024 TRSP - ROW - Final/Close-Out Passed
08/06/2024 TRSP - ROW - Landscape Architect Passed