Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 6523 E ESCALANTE RD
Search
Parcel Attributes
Parcel | 13623596B |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | R-2 |
Tucson Ward | Ward 4 |
Tucson Registered Neighborhood | Stella Mann |
Major Streets & Routes | Arterial or Collector |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 6523 E ESCALANTE RD
Date - 12/29/2024 3:10 p.m.
Total Number Of Annexations & Original City Zoning (2)
Rezoning Cases
Date - 12/29/2024 3:10 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-72-72 | City of Tucson - La Cholla Boulevard | R-2 | Effectuated | 09/07/2011 |
Permits
Address: 6523 E ESCALANTE RD
Date - 12/29/2024 3:10 p.m.
Total Number Of Permits - (4)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-RES-1223-10312 | Withdrawn | 12/29/2023 | 07/23/2024 | Residential Building - One or Two Family | Roof Mounted PV system DC SYSTEM SIZE (kW): 7.2 kW AC SYSTEM SIZE (kW): 5.22 kW W BREAKER TOBE LOCATED ON NEW EMPTY 60 AAC SERVICE COLLAR | |
TR-ROW-0924-01036 | Complete | 09/10/2024 | 10/17/2024 | Right-of-Way (ROW) | Replacing a drinking fountain and backflow near the Ramada on the South side of Escalante for David Marhefka. | |
TR-ROW-0324-00277 | Complete | 03/12/2024 | 08/06/2024 | Right-of-Way (ROW) | TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months. | |
TC-RES-0224-01030 | Complete | 02/21/2024 | 04/14/2025 | Residential Building - One or Two Family | Main Electrical Panel Upgrade to 125 Bus/100 Main Breaker. Existing Location |
Record Requests
Address: 6523 E ESCALANTE RD
Date - 12/29/2024 3:10 p.m.
Total Number Of Requests - (5)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0624-04540 | Denied | 06/25/2024 | N/A | Requests | **DENIED- NO PRE-ACTIVITY MEETING HELD / SCHEDULED VIA DASHBOARD** Projected finish is now July 18th. Requesting extension of 15 days. TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months. |
REQ-0624-04641 | Complete | 06/30/2024 | 07/05/2024 | Requests | Roof Mounted PV system DC SYSTEM SIZE (kW): 7.2 kW AC SYSTEM SIZE (kW): 5.22 kW W BREAKER TOBE LOCATED ON NEW EMPTY 60 AAC SERVICE COLLAR |
REQ-0724-04701 | Complete | 07/02/2024 | 07/03/2024 | Requests | Requesting additional 30 days, behind schedule and need more time to complete project. TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months. |
REQ-0824-05488 | Complete | 08/13/2024 | 08/16/2024 | Requests | We had the clearance inspection, just need the final to close out the permit. Main Electrical Panel Upgrade to 125 Bus/100 Main Breaker. Existing Location |
REQ-0924-06246 | Denied | 09/16/2024 | N/A | Requests | **DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD ** Replacing a drinking fountain and backflow near the Ramada on the South side of Escalante for David Marhefka. The Plumber has rescheduled to complete this work on Wednesday, September 25th. Please extend permit for an additional 14 days to allow for any delays. |