Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search
Parcel Attributes
Parcel13623596B
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 4
Tucson Registered NeighborhoodStella Mann
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 6523 E ESCALANTE RD
Date - 10/24/2024 3:14 a.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-72-35 Valley View East Numbers 4 & 5 3826 3894
C9-77-57 The Groves - Essex Gardens East 4696 4828

Rezoning Cases

Date - 10/24/2024 3:14 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-72-72 City of Tucson - La Cholla Boulevard R-2 Effectuated 09/07/2011

Permits

Address: 6523 E ESCALANTE RD
Date - 10/24/2024 3:14 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
TC-RES-1223-10312 Withdrawn 12/29/2023 07/23/2024 Residential Building - One or Two Family Roof Mounted PV system DC SYSTEM SIZE (kW): 7.2 kW AC SYSTEM SIZE (kW): 5.22 kW W BREAKER TOBE LOCATED ON NEW EMPTY 60 AAC SERVICE COLLAR
TR-ROW-0924-01036 Complete 09/10/2024 10/17/2024 Right-of-Way (ROW) Replacing a drinking fountain and backflow near the Ramada on the South side of Escalante for David Marhefka.
TR-ROW-0324-00277 Complete 03/12/2024 08/06/2024 Right-of-Way (ROW) TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
TC-RES-0224-01030 Complete 02/21/2024 04/14/2025 Residential Building - One or Two Family Main Electrical Panel Upgrade to 125 Bus/100 Main Breaker. Existing Location

Record Requests

Address: 6523 E ESCALANTE RD
Date - 10/24/2024 3:14 a.m.
Total Number Of Requests - (5)
Request Number Status Request Date Completed Date Type Description
REQ-0624-04540 Denied 06/25/2024 N/A Requests **DENIED- NO PRE-ACTIVITY MEETING HELD / SCHEDULED VIA DASHBOARD** Projected finish is now July 18th. Requesting extension of 15 days. TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
REQ-0624-04641 Complete 06/30/2024 07/05/2024 Requests Roof Mounted PV system DC SYSTEM SIZE (kW): 7.2 kW AC SYSTEM SIZE (kW): 5.22 kW W BREAKER TOBE LOCATED ON NEW EMPTY 60 AAC SERVICE COLLAR
REQ-0724-04701 Complete 07/02/2024 07/03/2024 Requests Requesting additional 30 days, behind schedule and need more time to complete project. TEP Patriot Greenway Project. Installation of Rainwater Harvesting Basins, Irrigation System, Plants and Rock Work. Working on the South side of Escalante from S Calle Polar to S Kolb Rd for approximately 3 months.
REQ-0824-05488 Complete 08/13/2024 08/16/2024 Requests We had the clearance inspection, just need the final to close out the permit. Main Electrical Panel Upgrade to 125 Bus/100 Main Breaker. Existing Location
REQ-0924-06246 Denied 09/16/2024 N/A Requests **DENIED - NO PRE-ACTIVITY MEETING SCHEDULED VIA THE DASHBOARD ** Replacing a drinking fountain and backflow near the Ramada on the South side of Escalante for David Marhefka. The Plumber has rescheduled to complete this work on Wednesday, September 25th. Please extend permit for an additional 14 days to allow for any delays.