Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
6175 S KOLB RD
Apply Date:
02/14/2024
Applicant:
Jim Morrison
Description:
Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170.

Permit Reviews

Permit Number - TR-ROW-0224-00166
Permit Status: Complete
Permit Description: Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170.
Start Date Submittal Complete Date Status  
02/14/2024 RIGHT-OF-WAY REVIEW v.1 02/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0224-00166
Permit Status: Complete
Permit Description: Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170.
Total Outstanding Activity Conditions - 3
Date Name
02/14/2024 PAVEMENT MORATORIUM
02/14/2024 Traffic control set-up approved between 9AM - 3:30PM
02/15/2024 The following extended traffic control set-up times were approved: 6am-8pm

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00166
Permite Description: Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/04/2024 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
05/06/2024 TRSP - ROW - Barricade Takedown N/A Re-inspection required barricades are still placed for closure.
05/03/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required backfill to begin next week with asphalt restoration set for 5/14
06/11/2024 TRSP - ROW - Paving - Subgrade/removal/placement N/A Re-inspection required no paving completed or needed

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0224-00166
Permit Description: Sewer work along Loop Ramp Rd. at Valencia Rd. Work associated with Development package TD-DEV-0323-00170.
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/12/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed message boards up today.
06/03/2024 TRSP - ROW - Barricade Takedown Passed
06/03/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
06/12/2024 TRSP - ROW - Final/Close-Out Passed site co pleated. asphalt for driveway to be completed with pia that is upcoming.
07/15/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed no asphalt restoration required

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
1_BD OASIS PUBLIC SEWER PLANS (REVISION 1)_V1.PDF DOCUMENTS VIEW
BD PUEBLO SEWER VARIANCE LETTER_V1.PDF DOCUMENTS VIEW
EAGLE ROCK - 6175 S KOLB RD - RIGHT - TURN LANE CL - PROJECT PUEBLO_V1.PDF DOCUMENTS VIEW