Permit: TR-ROW-0126-00062
Permit Details
Apply Date:
01/20/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Re-applying for an expired ROW permit, TR-ROW-1025-01252
Permit Reviews
Permit Number - TR-ROW-0126-00062
Permit Status: Complete
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 01/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0126-00062
Permit Status: Complete
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/22/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 01/22/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 01/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0126-00062
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with David Evans of Green Hill development over the phone. He informed me that work will begin either Friday 03/20/26 or early the following week. The plan is to backfill and coldmix the patch when completed and then wait for Tucson Water to finish before final pavement repair completion. Richey does fall under moratorium status so a moratorium patch will be required. | |
| 05/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/20/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/20/2026 | TRSP - ROW - Final | Passed |