Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2956 N RICHEY BL
Address NEW:
2956 N RICHEY BL
Apply Date:
01/20/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Re-applying for an expired ROW permit, TR-ROW-1025-01252

Permit Reviews

Permit Number - TR-ROW-0126-00062
Permit Status: Complete
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
Start Date Submittal Complete Date Status  
01/20/2026 RIGHT-OF-WAY REVIEW v.1 01/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0126-00062
Permit Status: Complete
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
Total Outstanding Activity Conditions - 3
Date Name
01/22/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
01/22/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
01/22/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0126-00062
Permit Description: Re-applying for an expired ROW permit, TR-ROW-1025-01252
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/18/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with David Evans of Green Hill development over the phone. He informed me that work will begin either Friday 03/20/26 or early the following week. The plan is to backfill and coldmix the patch when completed and then wait for Tucson Water to finish before final pavement repair completion. Richey does fall under moratorium status so a moratorium patch will be required.
05/20/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/20/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
05/20/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
1_SITE PLAN FOR 2956 NORTH RICHEY BL_V1.PDF DOCUMENTS VIEW
RICHEY SEWER CONNECTION DESIGN PLAN_V1.PDF DOCUMENTS VIEW
RICHEY TCP_V1.PDF DOCUMENTS VIEW