Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0124-00096
Permit Details
Apply Date:
01/24/2024
Applicant:
LYZETTE CELAYA
Description:
The contractor will be modifying the Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. Renewing permit TR-ROW-0523-00804. 90 DAY PERMIT. TRAFFIC CONTROL 6AM TO 6PM.
Permit Reviews
Permit Number - TR-ROW-0124-00096
Permit Status: Complete
Permit Description: The contractor will be modifying the Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. Renewing permit TR-ROW-0523-00804. 90 DAY PERMIT.
TRAFFIC CONTROL 6AM TO 6PM.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0124-00096
Permit Status: Complete
Permit Description: The contractor will be modifying the Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. Renewing permit TR-ROW-0523-00804. 90 DAY PERMIT.
TRAFFIC CONTROL 6AM TO 6PM.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/26/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
01/26/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0124-00096
Permit Description: The contractor will be modifying the Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians. Renewing permit TR-ROW-0523-00804. 90 DAY PERMIT.
TRAFFIC CONTROL 6AM TO 6PM.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
03/25/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
03/25/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
03/25/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |