Permit: TR-ROW-0124-00007
Permit Details
Apply Date:
01/03/2024
Applicant:
Description:
PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Work Order: DP19-0125
Permit Reviews
Permit Number - TR-ROW-0124-00007
Permit Status: Complete
Permit Description: PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
Work Order: DP19-0125
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/03/2024 | RIGHT-OF-WAY REVIEW v.1 | 01/03/2024 | REQUIRES RESUBMIT |
01/23/2024 | RIGHT-OF-WAY REVIEW v.2 | 02/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0124-00007
Permit Status: Complete
Permit Description: PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
Work Order: DP19-0125
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/23/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
01/23/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0124-00007
Permite Description: PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
Work Order: DP19-0125
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2024 | TRSP - ROW - Barricade Takedown | N/A | Re-inspection required | |
05/16/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0124-00007
Permit Description: PARTNERS ON FOURTH PAD, DP19-0125PERMIT FOR CONSTRUCTION FENCING ONLY AROUND PERIMETER OF FUTURE. Renewal of T22RW00032
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
Work Order: DP19-0125
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
07/25/2024 | TRSP - ROW - Final/Close-Out | Passed |