Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW)
Apply Date:
01/24/2023
Applicant:
DSW Permitting
Description:
Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility.

Permit Reviews

Permit Number - TR-ROW-0123-00289
Permit Status: Withdrawn
Permit Description: Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility.
Start Date Submittal Complete Date Status  
01/26/2023 RIGHT-OF-WAY REVIEW v.1 01/28/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0123-00289
Permit Status: Withdrawn
Permit Description: Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility.
Total Outstanding Activity Conditions - 1
Date Name
01/27/2023 Traffic control set-up approved between 9AM - 3:30PM

Conditions

Permit Number - TR-ROW-0123-00289
Permit Status: Withdrawn
Permit Description: Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility.
Date Description Comments
01/27/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.

Documents

File Name Document Type  
OCALC-Z3AFMGC082-TUC_TUC46_080 FINAL 04OCT22_V1.PDF DOCUMENTS VIEW
TCP - Z3AFMGC082-TUC_TUC46_080_V1.PDF DOCUMENTS VIEW
TEP APPROVED APP - Z3AFMGC082-TUC_TUC46_080 FINAL 04OCT22_V1.PDF DOCUMENTS VIEW
Z3AFMGC082-TUC_TUC46_080 FINAL 04OCT22_V1.PDF DOCUMENTS VIEW