Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 3901 E MONTECITO ST
Search
Parcel Attributes
Parcel | 126171110 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | R-1 |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | San Gabriel |
Major Streets & Routes | Gateway Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 3901 E MONTECITO ST
Date - 12/27/2024 2:59 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 3901 E MONTECITO ST
Date - 12/27/2024 2:59 p.m.
Total Number Of Permits - (9)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-RES-0524-03065 | Void | 05/21/2024 | 11/17/2024 | Residential Building - One or Two Family | tuff shed | |
TC-RES-0524-02963 | Needs Resubmittal | 05/15/2024 | 11/11/2024 | Residential Building - One or Two Family | Tuff shed | |
TR-UTL-0223-00765 | Complete | 02/03/2023 | 08/26/2023 | Right-of-Way (ROW) - Utility | Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility. | |
TD-DEV-0224-00036 | Void | 02/02/2024 | 02/01/2025 | Development Package | **VOID Scope of work would not require a DP** TUFF SHED LOCATION | |
TR-ROW-0123-00289 | Withdrawn | 01/24/2023 | N/A | Right-of-Way (ROW) | Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility. | |
T98CM05491 | EXPIRED | 12/10/1998 | 07/13/1999 | COMBO | FURNACE:REPLACEMENT:REPAIR:SERVICE | |
T98EL01645 | EXPIRED | 09/03/1998 | 04/01/1999 | ELECT | UPGRADE:ELECTRIC:60AMP TO 120AMP | |
T98PL01743 | EXPIRED | 09/03/1998 | 06/08/1999 | PLUMB | GAS LINE:REPIPE | |
T98PL02329 | EXPIRED | 11/24/1998 | 05/23/1999 | PLUMB | GAS LINE:REPLACEMENT |
Code Enforcement
Address: 3901 E MONTECITO ST
Date - 12/27/2024 2:59 p.m.
Total Number Of Code Cases - (4)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T17DV06543 | Closed - Resolved | 12/07/2017 | 12/07/2022 | Refuse and household items stored in yard and a large commerical truck stored in front yard | ||
CE-VIO0824-03502 | Closed - Resolved | 08/28/2024 | 10/15/2024 | REFS : Pile of tree trimmings in the front yard blocking the ROW | ||
CE-VIO0223-01820 | Citation | 02/09/2023 | RWOP / Work without permit, large storage shed in backyard | |||
CE-VIO0623-04148 | Referred | 06/21/2023 | 06/21/2023 | JMV / Referred to TPD Midtown / White, damaged, four door sedan with a flat tire, parked illegally without a cover, on the Pedestrian Right of Way |
Record Requests
Address: 3901 E MONTECITO ST
Date - 12/27/2024 2:59 p.m.
Total Number Of Requests - (3)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0223-01075 | Complete | 02/07/2023 | 02/27/2023 | Requests | Wrong Permit Type |
REQ-0523-02481 | Denied | 05/02/2023 | 05/18/2023 | Requests | Denied - No preconstruction meeting has been scheduled. Resubmit when ready to begin work. 30 Day Extension Request - Z3AFMGC082-TUC_TUC46_080 - This project will Bore 1,220', Trench 46' of (3) 1.25" and 1-4" Conduit, place 970' of Aerial 432F Cable to existing Utility Poles, place (3) 1-4" Risers and (4) 30"X48" Handholes and (7) Bore Pits immediately adjacent to, or directly associated with a small wireless facility. |
REQ-0523-02756 | Complete | 05/17/2023 | 05/18/2023 | Requests | Construction is complete, Pre-Con was conducted with Jeff Windstrom. We need to complete Slurry Seal only and need a 30 day extension. |