Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Private Improvement Agreement (PIA)
Apply Date:
09/17/2024
Applicant:
Andie Hemmah
Description:
Escalera Phase 2 (Residential), Lots 220 - 382 Public Paving Improvement Plans (PIA) - Includes new roads off of Paseo Gran Escalera of Adam Bunker Drive, Apodaca Drive, Carranza Drive, Hardesty Drive and Lebaron Drive, with new asphalt, curb, scuppers, catch basins, drainage, sidewalk, and access ramps.

Permit Reviews

Permit Number - TR-PIA-0924-00013
Permit Status: Inspections
Permit Description: Escalera Phase 2 (Residential), Lots 220 - 382 Public Paving Improvement Plans (PIA) - Includes new roads off of Paseo Gran Escalera of Adam Bunker Drive, Apodaca Drive, Carranza Drive, Hardesty Drive and Lebaron Drive, with new asphalt, curb, scuppers, catch basins, drainage, sidewalk, and access ramps.
Start Date Submittal Complete Date Status  
02/10/2026 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 02/11/2026 APPROVED Review Details
12/17/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 02/04/2026 REQUIRES RESUBMIT Review Details
10/17/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 12/08/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-PIA-0924-00013
Permite Description: Escalera Phase 2 (Residential), Lots 220 - 382 Public Paving Improvement Plans (PIA) - Includes new roads off of Paseo Gran Escalera of Adam Bunker Drive, Apodaca Drive, Carranza Drive, Hardesty Drive and Lebaron Drive, with new asphalt, curb, scuppers, catch basins, drainage, sidewalk, and access ramps.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
TRSP - PIA - Paving Inspection N/A Scheduled
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Barricade - Setup/Takedown/Routine N/A Scheduled
TRSP - PIA - Drainage - Pipe Installation/Removal N/A Scheduled
06/02/2026 TRSP - PIA - AB Placement N/A Partial Pass Nuclear Density tests on AB

Completed Inspections

Permit Status: Inspections
Permit Number: TR-PIA-0924-00013
Permit Description: Escalera Phase 2 (Residential), Lots 220 - 382 Public Paving Improvement Plans (PIA) - Includes new roads off of Paseo Gran Escalera of Adam Bunker Drive, Apodaca Drive, Carranza Drive, Hardesty Drive and Lebaron Drive, with new asphalt, curb, scuppers, catch basins, drainage, sidewalk, and access ramps.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/03/2026 TRSP - PIA - Pre-Construction Meeting Passed
06/05/2026 TRSP - PIA - AB Placement Passed AB Nuclear Density Tests - We were able to achieve 100% compaction with a nuclear device at four separate locations (Apodaca Dr, Carranza Dr, Adam Buckner Dr, and Dionicio Dr). The moisture was almost at optimum due to the water truck constantly cruising around and keeping the material moistened. The grade and elevation is close to where it needs to be and should be string lined on Monday, June 8th.
06/08/2026 TRSP - PIA - Pre-Paving Meeting/Inspection Passed String Line in preparation for paving -

Scheduled Inspections

Scheduled Inspections - TR-PIA-0924-00013
Status: Inspections
Description: Escalera Phase 2 (Residential), Lots 220 - 382 Public Paving Improvement Plans (PIA) - Includes new roads off of Paseo Gran Escalera of Adam Bunker Drive, Apodaca Drive, Carranza Drive, Hardesty Drive and Lebaron Drive, with new asphalt, curb, scuppers, catch basins, drainage, sidewalk, and access ramps.
Scheduled Date Description Entered By Entered Date
06/08/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
06/08/2026 TRSP - PIA - Roadway Subgrade Scheduled
06/08/2026 TRSP - PIA - Drainage Structure Scheduled
06/08/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
06/02/2026 TRSP - PIA - AB Placement Scheduled
06/08/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
06/08/2026 TRSP - PIA - Curb Placement Scheduled
06/08/2026 TRSP - PIA - Paving Inspection Scheduled
06/08/2026 TRSP - PIA - Sidewalk Placement Scheduled
06/08/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PLAN NO. I-2025-023.PDF DOCUMENTS VIEW
SUB3-LA ESCALERA PHASE 2 PIA_2-09-26_V3.PDF DOCUMENTS VIEW