Permit: TR-PIA-0924-00012
Permit Details
Status:
Issued
Type:
Private Improvement Agreement (PIA)
Address:
7510 S PASEO GRAN ESCALERA
Address NEW:
7510 S PASEO GRAN ESCALERA
Apply Date:
09/12/2024
Applicant:
Andie Hemmah
Description:
Public Paving, Grading, & Drainage Plans for Paseo Gran Escalera Phases 2-4 - a new collector road from Phase 1 to Houghton Road - Includes new asphalt, curb, ADA Ramps, sidewalks, multi-use path, medians, drainage, and landscaping.
Permit Reviews
Permit Number - TR-PIA-0924-00012
Permit Status: Issued
Permit Description: Public Paving, Grading, & Drainage Plans for Paseo Gran Escalera Phases 2-4 - a new collector road from Phase 1 to Houghton Road - Includes new asphalt, curb, ADA Ramps, sidewalks, multi-use path, medians, drainage, and landscaping.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 09/03/2025 | APPROVED |
| 06/23/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 08/13/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-PIA-0924-00012
Permite Description: Public Paving, Grading, & Drainage Plans for Paseo Gran Escalera Phases 2-4 - a new collector road from Phase 1 to Houghton Road - Includes new asphalt, curb, ADA Ramps, sidewalks, multi-use path, medians, drainage, and landscaping.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP – PIA – Underground Utility/Joint Trench | N/A | Scheduled | ||
| TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | N/A | Scheduled | ||
| TRSP - PIA - Drainage - Pipe Installation/Removal | N/A | Scheduled | ||
| TRSP - PIA - AB Placement | N/A | Scheduled | ||
| TRSP - PIA - Barricade - Setup/Takedown/Routine | N/A | Scheduled | ||
| TRSP - PIA - Roadway Subgrade | N/A | Scheduled | ||
| TRSP - PIA - Paving Inspection | N/A | Scheduled |
Completed Inspections
Permit Status: Issued
Permit Number: TR-PIA-0924-00012
Permit Description: Public Paving, Grading, & Drainage Plans for Paseo Gran Escalera Phases 2-4 - a new collector road from Phase 1 to Houghton Road - Includes new asphalt, curb, ADA Ramps, sidewalks, multi-use path, medians, drainage, and landscaping.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2024 | TRSP - PIA - Pre-Construction Meeting | Passed | Virtual Meeting | |
| 01/06/2026 | TRSP - PIA - Roadway Subgrade | Passed | String lining was done on subgrade between stations 10+50 & 13+50. The paving design will be 3 inches of asphaltic concrete on 4 inches of roadway AB. All measurements were within specifications for this paving area. |
Scheduled Inspections
Scheduled Inspections - TR-PIA-0924-00012
Status: Issued
Description: Public Paving, Grading, & Drainage Plans for Paseo Gran Escalera Phases 2-4 - a new collector road from Phase 1 to Houghton Road - Includes new asphalt, curb, ADA Ramps, sidewalks, multi-use path, medians, drainage, and landscaping.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 04/03/2026 | TRSP - PIA - Roadway Subgrade | Scheduled | |
| 04/03/2026 | TRSP - PIA - Paving Inspection | Scheduled | |
| 04/03/2026 | TRSP - PIA - Drainage - Pipe Installation/Removal | Scheduled | |
| 04/03/2026 | TRSP - PIA - AB Placement | Scheduled | |
| 04/03/2026 | TRSP - PIA - Barricade - Setup/Takedown/Routine | Scheduled | |
| 04/03/2026 | TRSP - PIA - Sidewalk Placement | Scheduled | |
| 04/03/2026 | TRSP – PIA – Underground Utility/Joint Trench | Scheduled | |
| 04/03/2026 | TRSP - PIA - Curb Placement | Scheduled | |
| 04/03/2026 | TRSP - PIA - Drainage Structure | Scheduled | |
| 04/03/2026 | TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork | Scheduled |