Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-PIA-0423-00016
Permit Details
Status:
Complete
Type:
Private Improvement Agreement (PIA)
Address:
7505 E BROADWAY BL
Address NEW:
7505 E BROADWAY BL
Apply Date:
04/20/2023
Applicant:
Edward Yunkherr
Description:
Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Permit Reviews
Permit Number - TR-PIA-0423-00016
Permit Status: Complete
Permit Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2025 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 08/07/2025 | APPROVED |
| 07/14/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 | 07/14/2023 | APPROVED |
| 04/20/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 | 06/02/2023 | REQUIRES RESUBMIT |
| 06/22/2023 | PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 | 06/30/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-PIA-0423-00016
Permite Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | N/A | Partial Pass | punch list uploaded. site passes with partial inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-PIA-0423-00016
Permit Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2023 | TRSP - PIA - Pre-Construction Meeting | Passed | ||
| 02/26/2024 | TRSP - PIA - Signage/Striping Final | Passed | all thermal placed. existing signs are in place. inspection passes. | |
| 02/26/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | all punch list items completed and site passes final inspection. |