Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Paid
Type:
Private Improvement Agreement (PIA)
Apply Date:
04/20/2023
Applicant:
Edward Yunkherr
Description:
Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.

Permit Reviews

Permit Number - TR-PIA-0423-00016
Permit Status: Fees paid
Permit Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Start Date Submittal Complete Date Status  
07/14/2023 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 07/14/2023 APPROVED Review Details
04/20/2023 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 06/02/2023 REQUIRES RESUBMIT Review Details
06/22/2023 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 06/30/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TR-PIA-0423-00016
Permite Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/09/2024 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) N/A Partial Pass punch list uploaded. site passes with partial inspection.

Completed Inspections

Permit Status: Fees Paid
Permit Number: TR-PIA-0423-00016
Permit Description: Offsite improvement plans for New Coffee Drive-thru Bldg at Broadway Blvd and Prudence Rd. Includes new ADA curb access ramp, new sidewalk and repaving lane.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/25/2023 TRSP - PIA - Pre-Construction Meeting Passed
02/26/2024 TRSP - PIA - Signage/Striping Final Passed all thermal placed. existing signs are in place. inspection passes.
02/26/2024 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed all punch list items completed and site passes final inspection.

Documents

File Name Document Type  
TRAFFIC CONTROL PLAN 23-0191.PDF DOCUMENTS VIEW
PIA PERMIT TR-PIA-0423-00016.PDF DOCUMENTS VIEW
PLAN NO. U-2023-015.PDF DOCUMENTS VIEW
2_COMMENT RESPONSE LTR_V1.PDF DOCUMENTS VIEW
3_COMMENT RESPONSE LTR_V1.PDF DOCUMENTS VIEW
3_PIA PLAN PRUDENCE_V3.PDF DOCUMENTS VIEW
PIA APPLICATION_V1.PDF DOCUMENTS VIEW
LUMEN CLEARANCE LTR_V1.PDF DOCUMENTS VIEW
TUCSON WATER NOTICE_V1.PDF DOCUMENTS VIEW
COT IT CLEARANCE LTR_V1.PDF DOCUMENTS VIEW