Permit Details

Status:
Inspections
Type:
Private Improvement Agreement (PIA)
Apply Date:
02/13/2025
Applicant:
Eric Cheney
Description:
La Escalera Phase 4

Permit Reviews

Permit Number - TR-PIA-0225-00001
Permit Status: Inspections
Permit Description: La Escalera Phase 4
Start Date Submittal Complete Date Status  
07/28/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3 09/18/2025 APPROVED Review Details
07/07/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 07/15/2025 REQUIRES RESUBMIT Review Details
02/25/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 05/16/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TR-PIA-0225-00001
Permit Status: Inspections
Permit Description: La Escalera Phase 4
Date Description Comments
09/05/2025 This project requires a Right-of-Way (ROW) permit issued by Department of Transportation and Mobility (DTM) prior to working in the public Right-of-Way.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-PIA-0225-00001
Permite Description: La Escalera Phase 4
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
TRSP – PIA – Underground Utility/Joint Trench N/A Scheduled
TRSP - PIA - Drainage - Pipe Installation/Removal N/A Scheduled
TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork N/A Scheduled
TRSP - PIA - Paving Inspection N/A Scheduled
04/17/2026 TRSP - PIA - AB Placement N/A Re-inspection required Compaction tests did not pass. Highest percentage was 96%. The moisture was above optimum in some areas, and I don't believe the depth was at what it calls for which is 4". They were still trucking in some as we were testing. A re-test is going to be done on Monday of next week. The tester also requested to have a sand cone as back up in case nuclear densities are still low.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-PIA-0225-00001
Permit Description: La Escalera Phase 4
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/24/2026 TRSP - PIA - AB Placement Passed Four nuclear density tests were taken after 2 sand cone tests were run the day prior to figure out what was needed to reach maximum compaction. The tests were taken at Kiara Peak in front of lot 166, Nala Peak in front of lot 181, Russell Ridge in front of lot 194 and Lebaron in front of lot 150. AB needs to be kept with plenty of moisture and rolled with rubber tire.

Scheduled Inspections

Scheduled Inspections - TR-PIA-0225-00001
Status: Inspections
Description: La Escalera Phase 4
Scheduled Date Description Entered By Entered Date
04/28/2026 TRSP - PIA - Drainage Structure Scheduled
04/28/2026 TRSP - PIA - AB Placement Scheduled
04/28/2026 TRSP – PIA – Demo/Clearing and Grubbing/Grading/Earthwork Scheduled
04/28/2026 TRSP - PIA - Paving Inspection Scheduled
04/28/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Scheduled
04/28/2026 TRSP - PIA - Sidewalk Placement Scheduled
04/28/2026 TRSP – PIA – Underground Utility/Joint Trench Scheduled
04/28/2026 TRSP - PIA - Roadway Subgrade Scheduled
04/28/2026 TRSP - PIA - Drainage - Pipe Installation/Removal Scheduled
04/28/2026 TRSP - PIA - Curb Placement Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
PLAN NO. I-2025-010.PDF DOCUMENTS VIEW
SUB2-EOR-COMMENT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
SUB1-LA ESCALERA PHASE 4 LOTS 1-215 PIA_4-4-25_V1_DTM COMMENTS.PDF DOCUMENTS VIEW