Inspection Status: Passed
Inspection History: TRSP - PIA - Pre-Paving Meeting/Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 02/12/2026 |
TRSP - PIA - Pre-Paving Meeting/Inspection |
|
Passed |
AB was string lined from Pyramid Ridge and Lookout Peak to Panopeia, Chamber Ridge, and Lebaron. All roadways were within the specification; AB was clean of debris and has been moistened throughout the day. It is considered blue topped and will be closed off to traffic. |
| 04/29/2026 |
TRSP - PIA - Pre-Paving Meeting/Inspection |
|
Passed |
Pre-Paving - Densities finally reached compaction. All is good. |
| 07/21/2026 |
TRSP - PIA - Pre-Paving Meeting/Inspection |
|
Passed |
Pre Paving Inspection - String lining was done for pre-paving inspection of AB at Escalera Ph 4C. All areas were within specifications and there were no areas of concern like pumping spots or areas that were too high per the grade. The AB has been passed with compaction prior to this inspection and was able to achieve 100% compaction in multiple spots. |