Permit: TD-DEV-1224-00346
Permit Details
Apply Date:
12/19/2024
Applicant:
Barbara Brown
Description:
Rev 1: Building setbacks, parking requirements, building GFA & acreage have been updated to reflect changes for Phase II and waste stream calculations have been updated to reflect changes for both Phase I and Phase II. Two new food service buildings
Permit Reviews
Permit Number - TD-DEV-1224-00346
Permit Status: Issued
Permit Description: Rev 1: Building setbacks, parking requirements, building GFA & acreage have been updated to reflect changes for Phase II and waste stream calculations have been updated to reflect changes for both Phase I and Phase II.
Two new food service buildings
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/14/2026 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 09/24/2026 | APPROVED |
| 02/24/2025 | DEVELOPMENT PACKAGE NEW v.2 | 03/06/2025 | APPROVED |
| 03/07/2025 | DEVELOPMENT PACKAGE NEW v.1 | 03/07/2025 | REQUIRES RESUBMIT |
| 07/15/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/14/2026 | REQUIRES RESUBMIT |
| 12/23/2024 | DEVELOPMENT PACKAGE NEW v.1 | 01/30/2025 | REQUIRES RESUBMIT |
| 04/18/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/20/2025 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-1224-00346
Permite Description: Rev 1: Building setbacks, parking requirements, building GFA & acreage have been updated to reflect changes for Phase II and waste stream calculations have been updated to reflect changes for both Phase I and Phase II.
Two new food service buildings
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2026 | For trash and recycling enclosures | N/A | Partial Pass | Footer is correct. Okay to pour footer for double refuse enclosure. Schedule pre-grout inspections. I discussed grout inspections with contractor |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1224-00346
Permit Description: Rev 1: Building setbacks, parking requirements, building GFA & acreage have been updated to reflect changes for Phase II and waste stream calculations have been updated to reflect changes for both Phase I and Phase II.
Two new food service buildings
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting scheduled by City staff, held on-site. No major site work has taken place yet. Need to schedule 'Stormwater Initial' inspection as soon as wattle is in place on South border. | |
| 08/27/2026 | SITE - Stormwater Setup and Controls | Passed | 8/27/26 Contractor has placed wattle along the south side of site where the drainanage has changed and that area is protected correctly.Monitor that side making sure no sediment is running onto the multi-use path. If so the wattle will need to be repaired to function as designed. |