Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2026 | SITE - Stormwater Setup and Controls | Passed | 8/27/26 Contractor has placed wattle along the south side of site where the drainanage has changed and that area is protected correctly.Monitor that side making sure no sediment is running onto the multi-use path. If so the wattle will need to be repaired to function as designed. |