Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3993 N CAMPBELL AV
Apply Date:
12/15/2022
Applicant:
Cary Broschat
Description:
177.66kW DC, 150kW AC Photovoltaic Solar Project

Permit Reviews

Permit Number - TD-DEV-1222-00079
Permit Status: Complete
Permit Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
Start Date Submittal Complete Date Status  
03/09/2023 DEVELOPMENT PACKAGE REVIEW v.3 03/20/2023 APPROVED Review Details
01/18/2023 DEVELOPMENT PACKAGE REVIEW v.2 02/15/2023 REQUIRES RESUBMIT Review Details
12/20/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/27/2022 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00079
Permite Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
COT - FCON - Fire - Final N/A Not Ready contractor canceled this inspection

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00079
Permit Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
Total Completed Inspections - 14
Date Description Inspector Results Comments
04/24/2023 PDSD Engineering Division Pre-Construction SITE Passed Met with a contractor they will start to work this week and then just bedtime for me. It’s 5 to 6 weeks from today.
04/24/2023 Final inspection to ensure all landscape and water harvesting SITE Passed N/A
04/24/2023 ENGR Engineering Final Passed N/A
04/24/2023 SITE - Stormwater Final Inspection Passed N/A
04/24/2023 SITE Passed N/A
04/24/2023 COT - ENGR - Site - Assurance Release Passed
04/24/2023 ENGR - Drainage Structures Passed N/A
04/24/2023 PDSD Site/Engineering Division - Landscaping Passed N/A
04/24/2023 PDSD Site/Engineering Division - NPPO Passed N/A
06/09/2023 SITE - Zoning Final Passed
06/09/2023 COT - ENGR - Stormwater Passed
06/09/2023 COT - SITE - Zoning Intermediate Passed
06/09/2023 SITE - Stormwater Follow-up Passed
06/09/2023 SITE - Stormwater Setup and Controls Passed

Documents

File Name Document Type  
APPROVED ST. PHILLIPS CORNER_DEV PACKAGE_REVISION 2_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ST. PHILIP'S CORNER DP COMMENT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
ST. PHILLIPS CORNER_DEV PACKAGE_230111_V1.PDF DOCUMENTS VIEW