Permit: TD-DEV-1222-00079
Permit Details
Status:
Complete
Type:
Development Package
Address:
3993 N CAMPBELL AV
Address NEW:
3993 N CAMPBELL AV
Apply Date:
12/15/2022
Applicant:
Cary Broschat
Description:
177.66kW DC, 150kW AC Photovoltaic Solar Project
Permit Reviews
Permit Number - TD-DEV-1222-00079
Permit Status: Complete
Permit Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 03/20/2023 | APPROVED |
| 01/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 02/15/2023 | REQUIRES RESUBMIT |
| 12/20/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/27/2022 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00079
Permite Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Fire - Final | N/A | Not Ready | contractor canceled this inspection |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00079
Permit Description: 177.66kW DC, 150kW AC Photovoltaic Solar Project
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Met with a contractor they will start to work this week and then just bedtime for me. It’s 5 to 6 weeks from today. | |
| 04/24/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | N/A | |
| 04/24/2023 | ENGR Engineering Final | Passed | N/A | |
| 04/24/2023 | SITE - Stormwater Final Inspection | Passed | N/A | |
| 04/24/2023 | SITE | Passed | N/A | |
| 04/24/2023 | COT - ENGR - Site - Assurance Release | Passed | ||
| 04/24/2023 | ENGR - Drainage Structures | Passed | N/A | |
| 04/24/2023 | PDSD Site/Engineering Division - Landscaping | Passed | N/A | |
| 04/24/2023 | PDSD Site/Engineering Division - NPPO | Passed | N/A | |
| 06/09/2023 | SITE - Zoning Final | Passed | ||
| 06/09/2023 | COT - ENGR - Stormwater | Passed | ||
| 06/09/2023 | COT - SITE - Zoning Intermediate | Passed | ||
| 06/09/2023 | SITE - Stormwater Follow-up | Passed | ||
| 06/09/2023 | SITE - Stormwater Setup and Controls | Passed |