Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
550 N ALVERNON WY
Apply Date:
12/06/2022
Applicant:
Kevin Letendre
Description:
*Revision #2 started 4/25/24 (fuel tank relocation)* Redevelopment of a closed gas station to a new gas station.

Permit Reviews

Permit Number - TD-DEV-1222-00064
Permit Status: Complete
Permit Description: *Revision #2 started 4/25/24 (fuel tank relocation)* Redevelopment of a closed gas station to a new gas station.
Start Date Submittal Complete Date Status  
04/25/2024 DEVELOPMENT PACKAGE NEW v.1 05/20/2024 APPROVED Review Details
05/17/2023 DEVELOPMENT PACKAGE REVIEW v.1 06/27/2023 APPROVED Review Details
03/06/2023 DEVELOPMENT PACKAGE REVIEW v.2 03/30/2023 APPROVED Review Details
12/14/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/24/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00064
Permite Description: *Revision #2 started 4/25/24 (fuel tank relocation)* Redevelopment of a closed gas station to a new gas station.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/21/2023 Final inspection to ensure all landscape and water harvesting SITE N/A Not Ready Apperas USTs have been upgraded and new dispensers
04/01/2024 ENGR Engineering Final N/A Partial Pass solid waste enclosure/gate not per plan,

ADA access from ADA parking space to bus stop not compliant with ADA ( may need additional ramps and railing),

ADA parking space sign needs “Van Accessible” sign,

long term bicycle locker not present,

southern border with former Starsys building still has trees, solid waste, and disturbed areas present.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1222-00064
Permit Description: *Revision #2 started 4/25/24 (fuel tank relocation)* Redevelopment of a closed gas station to a new gas station.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/19/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
03/19/2024 SITE - Zoning Final Passed
04/01/2024 SITE - Stormwater Final Inspection Passed
06/07/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV2_1_76 STATION DEV PLAN_V2_V1.PDF DOCUMENTS VIEW
APPROVED 2_76 STATION DEV PLAN_V2_V2.PDF DOCUMENTS VIEW