Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 126070020


Addresses:

550 N ALVERNON WY


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TD-DEV-1222-00064

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
03/19/2024 ENGR Engineering Final Not Ready the following was observed when compared to the approved Site Plan (this should not be considered a comprehensive list):

the east-west hatched crosswalk from the existing building to N Alvernon (item #4),

solid waste enclosure, chain link fence, and bollards (#’s 3, 4, & 10),

long/short term bicycle parking (#’s 7 & 10),

ADA parking (van accessible) and associated ADA sidewalks
(northeast corner of property) leading to bus stop are not present.

run and cross slope percentages should be measured to assure ADA compliance.

south property curb not complete and there are disturbed areas in the adjoining landscape areas.
04/01/2024 ENGR Engineering Final Partial Pass solid waste enclosure/gate not per plan,

ADA access from ADA parking space to bus stop not compliant with ADA ( may need additional ramps and railing),

ADA parking space sign needs “Van Accessible” sign,

long term bicycle locker not present,

southern border with former Starsys building still has trees, solid waste, and disturbed areas present.
04/04/2024 ENGR Engineering Final Partial Pass property owner to revise and resubmit plans for COT approval:

solid waste enclosure gates to moved farther east,

long term bicycle parking to be interior to building,

ADA access to public transportation stop to be reconfigured.
05/30/2024 ENGR Engineering Final Not Ready
06/07/2024 ENGR Engineering Final Passed
12/21/2023 ENGR Engineering Final Not Ready appears USTs have been upgraded, new dispensers.