Permit: TD-DEV-1124-00301
Permit Details
Status:
Complete
Type:
Development Package
Address:
2150 E BROADWAY BL
Address NEW:
2150 E BROADWAY BL
Apply Date:
11/06/2024
Applicant:
Blake Junak
Description:
Rev 1 - Started 09.14.2025 ** New commercial building for food & beverage sales
Permit Reviews
Permit Number - TD-DEV-1124-00301
Permit Status: Complete
Permit Description: Rev 1 - Started 09.14.2025 ** New commercial building for food & beverage sales
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/15/2025 | REQUIRES RESUBMIT |
| 03/20/2025 | DEVELOPMENT PACKAGE NEW v.3 | 03/27/2025 | APPROVED |
| 10/29/2025 | DEVELOPMENT PACKAGE NEW REVISION v.3 | 11/07/2025 | APPROVED |
| 01/28/2025 | DEVELOPMENT PACKAGE NEW v.2 | 03/19/2025 | REQUIRES RESUBMIT |
| 09/18/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 10/21/2025 | REQUIRES RESUBMIT |
| 11/07/2024 | DEVELOPMENT PACKAGE NEW v.1 | 12/13/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-1124-00301
Permit Status: Complete
Permit Description: Rev 1 - Started 09.14.2025 ** New commercial building for food & beverage sales
| Date | Description | Comments |
|---|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1124-00301
Permite Description: Rev 1 - Started 09.14.2025 ** New commercial building for food & beverage sales
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | SITE - SWPPP Correction Notice | N/A | Failed | Concrete washout basin not being used, washout going straight to soil (see photo). Appropriate concrete washout containment must be used. West edge of site is missing sediment log, this is the low side and prone to washing into the street (see photo). Sediment must be prevented from leaving the site. Issues verbally communicated to Carlos. |
| 06/20/2025 | N/A | Partial Pass | Benchmarks are set, grade stakes are in place, initial rough grading of the site matches plans. Building pad will need a separate inspection on the building permit. | |
| 12/23/2025 | N/A | Partial Pass | Contract is good to pour the stairs on the south west side at the loading dock area | |
| 12/09/2025 | ENGR Paving | N/A | Partial Pass | Contractors paving the front of the building and the parking area in the front |
| 11/24/2025 | N/A | Partial Pass | Contractor, good to pour the bollards in front of the store | |
| 10/06/2025 | For trash and recycling enclosures | N/A | Partial Pass | Contract is good to pour the grout for the trash enclosure |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1124-00301
Permit Description: Rev 1 - Started 09.14.2025 ** New commercial building for food & beverage sales
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 07/14/2025 | SITE - Stormwater Setup and Controls | Passed | Need designated concrete washout containment on site. Need sediment log/wattle where runoff is likely. Make sure SWPPP board and contact information is visible at site entrance. |
|
| 01/29/2026 | Passed | |||
| 01/29/2026 | Passed | |||
| 01/29/2026 | Passed | |||
| 01/29/2026 | ENGR Paving | Passed | ||
| 03/02/2026 | SITE - Zoning Final | Passed | ||
| 03/02/2026 | SITE - Stormwater Final Inspection | Passed | ||
| 03/02/2026 | LAND Landscape Appearance & Function Final | Passed | ||
| 03/02/2026 | Passed | |||
| 03/02/2026 | Passed | |||
| 03/20/2026 | Passed | Handrails around and leading up to loading dock is complete and in accordance with approved plans. | ||
| 03/24/2026 | Passed | |||
| 03/27/2026 | COT - ENGR - Signage Final | Passed | ||
| 03/27/2026 | ENGR Engineering Final | Passed | ||
| 03/27/2026 | For trash and recycling enclosures | Passed |