Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-1124-00301
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2025 | Partial Pass | Curb form on North side are accurate, make sure expansion joints are set appropriately. Concrete washout is over-filled, needs replaced. |
||
| 11/25/2025 | Failed | contractor had me scheduled for 930 -10 o’clock this morning. I showed up and nothing was ready so Carlos asked me if I could come back by 12:30. I told him I could. I showed up at 12:30 the sidewalks not ready the entrance of the south west side part of it’s ready but the driveway apron is noncompliance. Third-party material tester was on site tested the AB grade failed. Contractor dug out the area that was wet and replaced it with new AB. Still failed contractor will reschedule for tomorrow. | ||
| 11/26/2025 | Partial Pass | Contractor for 30 yards of concrete from the apron going east everything looks good | ||
| 12/03/2025 | Partial Pass | Contractors go to poor the ramp at the south west corner of the building |