Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 12904158F


Addresses:

2150 E BROADWAY BL


Inspection Status: Partial Pass

Inspection History

Permit Number - TD-DEV-1124-00301

Inspection Description -

Inspection Status - Partial Pass

Date Description Inspector Results Comments
09/03/2025 Partial Pass Curb form on North side are accurate, make sure expansion joints are set appropriately.
Concrete washout is over-filled, needs replaced.
11/25/2025 Failed contractor had me scheduled for 930 -10 o’clock this morning. I showed up and nothing was ready so Carlos asked me if I could come back by 12:30. I told him I could. I showed up at 12:30 the sidewalks not ready the entrance of the south west side part of it’s ready but the driveway apron is noncompliance. Third-party material tester was on site tested the AB grade failed. Contractor dug out the area that was wet and replaced it with new AB. Still failed contractor will reschedule for tomorrow.
11/26/2025 Partial Pass Contractor for 30 yards of concrete from the apron going east everything looks good
12/03/2025 Partial Pass Contractors go to poor the ramp at the south west corner of the building
12/08/2025 Partial Pass Contractor is good to pour 60 lineal feet of vertical curb
12/09/2025 Partial Pass Contractor poured the last piece of the driveway coming in off of the west side.
12/16/2025 Partial Pass Contractor can pour the sidewalk on the west side and on the north side
12/18/2025 Partial Pass Contractor for the sidewalk on the south side of the building
12/23/2025 Partial Pass Contract is good to pour the stairs on the south west side at the loading dock area