Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-1122-00011
Permit Details
Status:
Issued
Type:
Development Package
Address:
2749 N CAMPBELL AV
Address NEW:
2749 N CAMPBELL AV
Apply Date:
11/01/2022
Applicant:
Lawrence McManus
Description:
Original Chopshop
Permit Reviews
Permit Number - TD-DEV-1122-00011
Permit Status: Issued
Permit Description: Original Chopshop
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 03/28/2023 | APPROVED |
| 01/10/2024 | DEVELOPMENT PACKAGE NEW v.1 | 01/31/2024 | APPROVED |
| 11/03/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/20/2022 | REQUIRES RESUBMIT |
| 01/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 02/13/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-1122-00011
Permite Description: Original Chopshop
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2023 | ENGR - Drainage Structures | N/A | Not Applicable | needs to be inspected by Building Department |
| 11/07/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 11/07/2023 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 11/07/2023 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | |
| 11/07/2023 | ENGR Engineering Final | N/A | Not Ready | |
| 11/07/2023 | SITE | N/A | Not Ready | |
| 11/07/2023 | SITE - Stormwater Follow-up | N/A | Not Ready | |
| 11/07/2023 | COT - ENGR - Stormwater | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1122-00011
Permit Description: Original Chopshop
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | no concerns noted on site at this time. Contractor has poured a bunch of the vertical curb on already and his building pad is roughly graded, but will not be doing the building work. Contractor asked that I stop by to discuss with him the inspections for the utilities. I advised him he needed a utility permit to be doing that work, reminded him that the west side wall will need a permit also. It is a retaining wall of more than 2 feet of retention that will need to be obtained by the contractor prior to Inspecting the footer for pouring. | |
| 11/08/2023 | SITE - Stormwater Final Inspection | Passed | ||
| 11/08/2023 | SITE - Zoning Final | Passed | ||
| 11/08/2023 | ENGR Grading Final | Passed | ||
| 11/09/2023 | COT - ENGR - Signage Final | Passed | ||
| 11/09/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 11/09/2023 | ENGR Engineering Final | Passed | ||
| 11/09/2023 | SITE | Passed | ||
| 11/09/2023 | SITE - Stormwater Follow-up | Passed | ||
| 11/09/2023 | COT - ENGR - Stormwater | Passed |