Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - TD-DEV-1122-00011
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | no concerns noted on site at this time. Contractor has poured a bunch of the vertical curb on already and his building pad is roughly graded, but will not be doing the building work. Contractor asked that I stop by to discuss with him the inspections for the utilities. I advised him he needed a utility permit to be doing that work, reminded him that the west side wall will need a permit also. It is a retaining wall of more than 2 feet of retention that will need to be obtained by the contractor prior to Inspecting the footer for pouring. |