Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 113100040


Addresses:

2749 N CAMPBELL AV


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - TD-DEV-1122-00011

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
05/02/2023 PDSD Engineering Division Pre-Construction SITE Passed no concerns noted on site at this time. Contractor has poured a bunch of the vertical curb on already and his building pad is roughly graded, but will not be doing the building work. Contractor asked that I stop by to discuss with him the inspections for the utilities. I advised him he needed a utility permit to be doing that work, reminded him that the west side wall will need a permit also. It is a retaining wall of more than 2 feet of retention that will need to be obtained by the contractor prior to Inspecting the footer for pouring.