Permit: TD-DEV-1024-00281
Permit Details
Status:
Complete
Type:
Development Package
Address:
2401 S HOUGHTON RD
Address NEW:
2401 S HOUGHTON RD
Apply Date:
10/08/2024
Applicant:
Cary Broschat
Description:
install PV Solar ground mount tracking system 308 KW dc/ 240 KW ac This is project for the City of Tucson
Permit Reviews
Permit Number - TD-DEV-1024-00281
Permit Status: Complete
Permit Description: install PV Solar ground mount tracking system 308 KW dc/ 240 KW ac
This is project for the City of Tucson
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2025 | DEVELOPMENT PACKAGE NEW v.5 | 06/17/2025 | REQUIRES RESUBMIT |
| 11/04/2024 | DEVELOPMENT PACKAGE NEW v.3 | 12/16/2024 | REQUIRES RESUBMIT |
| 10/17/2024 | DEVELOPMENT PACKAGE NEW v.1 | 10/24/2024 | REQUIRES RESUBMIT |
| 10/25/2024 | DEVELOPMENT PACKAGE NEW v.2 | 10/25/2024 | REQUIRES RESUBMIT |
| 02/13/2025 | DEVELOPMENT PACKAGE NEW v.4 | 03/14/2025 | REQUIRES RESUBMIT |
| 06/24/2025 | DEVELOPMENT PACKAGE NEW v.6 | 07/14/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1024-00281
Permit Description: install PV Solar ground mount tracking system 308 KW dc/ 240 KW ac
This is project for the City of Tucson
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | On-site meeting was held, City expectations were discussed. Next steps are "NPPO pre-construction" inspection and "SWPPP Stormwater initial" inspection. | |
| 11/17/2025 | SITE - Stormwater Setup and Controls | Passed | SWPPP devices are in place with exception of concrete washout. Washout needs to be in place prior to and concrete work. | |
| 11/17/2025 | NPPO Pre-Construction | Passed | NPPO plants have been protected as necessary. | |
| 04/13/2026 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Wall is at finished height, bond beam is in place with exception of section on south side. Once bond beam is in place, okay to grout. | |
| 05/11/2026 | SITE - Zoning Final | Passed |