Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date |
Description |
Inspector |
Results |
Comments |
| 02/04/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Wall footing excavation is proper depth, schedule an inspection once rebar is in place prior to pouring concrete. |
| 02/13/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Footing reinforcement is good. Okay to pour. |
| 02/23/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Footing for gates: excavation and reinforcement are good. Okay to pour footings. |
| 03/25/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Wall progress is good, call next inspection prior to grouting cells to ensure vertical reinforcement and bond beams are in place. |
| 04/02/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Partial Pass |
Wall construction to 4-5ft is correct and okay to grout. |
| 04/13/2026 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Passed |
Wall is at finished height, bond beam is in place with exception of section on south side. Once bond beam is in place, okay to grout. |