Permit: TD-DEV-1023-00436
Permit Details
Status:
Complete
Type:
Development Package
Address:
14025 W MILE WIDE RD
Address NEW:
14025 W MILE WIDE RD
Apply Date:
10/26/2023
Applicant:
Cary Broschat
Description:
Restricted Access *Revision #1 started 3/22/24 (PV spacing, SWPPP, NPPO)* - Install PV solar tracking system 8745 KW dc 7500 KW ac (flood plain permit through PIMA COUNTY) PROJECT FOR CITY OF TUCSON
Permit Reviews
Permit Number - TD-DEV-1023-00436
Permit Status: Complete
Permit Description: Restricted Access *Revision #1 started 3/22/24 (PV spacing, SWPPP, NPPO)* - Install PV solar tracking system 8745 KW dc 7500 KW ac
(flood plain permit through PIMA COUNTY)
PROJECT FOR CITY OF TUCSON
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
| 10/31/2023 | DEVELOPMENT PACKAGE NEW v.1 | 11/03/2023 | REQUIRES RESUBMIT |
| 11/06/2023 | DEVELOPMENT PACKAGE NEW v.2 | 12/12/2023 | APPROVED |
| 03/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/12/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00436
Permite Description: Restricted Access *Revision #1 started 3/22/24 (PV spacing, SWPPP, NPPO)* - Install PV solar tracking system 8745 KW dc 7500 KW ac
(flood plain permit through PIMA COUNTY)
PROJECT FOR CITY OF TUCSON
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Hydro seed has started, part of the staging area and between the rows of panels. Continued once a month inspections will be needed until March where the gear will be set and project closed out. Notice of termination will be needed for the SWPPP to be closed out. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1023-00436
Permit Description: Restricted Access *Revision #1 started 3/22/24 (PV spacing, SWPPP, NPPO)* - Install PV solar tracking system 8745 KW dc 7500 KW ac
(flood plain permit through PIMA COUNTY)
PROJECT FOR CITY OF TUCSON
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/22/2024 | NPPO Pre-Construction | Passed | ||
| 05/22/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 05/23/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 05/24/2024 | NPPO Monitoring | Passed | NPPO required 1 relocated fishhook barrel. 2 relocated. | |
| 12/11/2024 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Send pictures of the few broken welds tied off. | |
| 03/24/2025 | ENGR Engineering Final | Passed | Everything here has been installed per plan, hydro seed is completed. | |
| 04/21/2025 | SITE - Stormwater Final Inspection | Passed | ||
| 04/21/2025 | SITE - Stormwater Follow-up | Passed |