Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2025 |
SITE - Stormwater Follow-up
|
|
Passed |
|
| 06/20/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
Remote inspection |
| 06/04/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No issues |
| 06/24/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No evidence of moisture at this time. All BMPs are in good shape |
| 07/24/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Moisture has been minimal at only 1/4 inch so far, rain gauge is working properly. |
| 08/07/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Continued maintenance is paying off, Solon is staying on top of the BMPs and everything looks great. |
| 08/21/2024 |
SITE - Stormwater Follow-up
|
|
Not Ready |
Contractor called me. he’s going to reschedule for tomorrow. |
| 08/22/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No concerns at this time even after the rain last night everything still looks good |
| 09/06/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Minor trash has blown into the area north of the lay-down yard but was being picked up as I was there. Maintenance here has been very good. |
| 09/18/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
There’s no concerns at this time. Everything is looking good. |
| 10/16/2024 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
|
| 11/19/2024 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Hydro seed has started, part of the staging area and between the rows of panels. Continued once a month inspections will be needed until March where the gear will be set and project closed out. Notice of termination will be needed for the SWPPP to be closed out. |