Permit: TD-DEV-1023-00436

Parcel: 21114007C

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
04/21/2025 SITE - Stormwater Follow-up Passed
06/20/2024 SITE - Stormwater Follow-up Partial Pass Remote inspection
06/04/2024 SITE - Stormwater Follow-up Complete (Recurring) No issues
06/24/2024 SITE - Stormwater Follow-up Complete (Recurring) No evidence of moisture at this time. All BMPs are in good shape
07/24/2024 SITE - Stormwater Follow-up Complete (Recurring) Moisture has been minimal at only 1/4 inch so far, rain gauge is working properly.
08/07/2024 SITE - Stormwater Follow-up Complete (Recurring) Continued maintenance is paying off, Solon is staying on top of the BMPs and everything looks great.
08/21/2024 SITE - Stormwater Follow-up Not Ready Contractor called me. he’s going to reschedule for tomorrow.
08/22/2024 SITE - Stormwater Follow-up Complete (Recurring) No concerns at this time even after the rain last night everything still looks good
09/06/2024 SITE - Stormwater Follow-up Complete (Recurring) Minor trash has blown into the area north of the lay-down yard but was being picked up as I was there. Maintenance here has been very good.
09/18/2024 SITE - Stormwater Follow-up Complete (Recurring) There’s no concerns at this time. Everything is looking good.
10/16/2024 SITE - Stormwater Follow-up Partial Pass
11/19/2024 SITE - Stormwater Follow-up Complete (Recurring) Hydro seed has started, part of the staging area and between the rows of panels. Continued once a month inspections will be needed until March where the gear will be set and project closed out. Notice of termination will be needed for the SWPPP to be closed out.