Permit: TD-DEV-0925-00236
Permit Details
Apply Date:
09/10/2025
Applicant:
angel islas
Description:
100 Unit 3-Story Multi-Family Apartment Building (for the elderly) with associated parking, landscaping and drainage.
Permit Reviews
Permit Number - TD-DEV-0925-00236
Permit Status: Inspections
Permit Description: 100 Unit 3-Story Multi-Family Apartment Building (for the elderly) with associated parking, landscaping and drainage.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/11/2025 | DEVELOPMENT PACKAGE NEW v.1 | 10/27/2025 | REQUIRES RESUBMIT |
| 12/12/2025 | DEVELOPMENT PACKAGE NEW v.3 | 12/15/2025 | APPROVED |
| 11/12/2025 | DEVELOPMENT PACKAGE NEW v.2 | 12/11/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0925-00236
Permit Status: Inspections
Permit Description: 100 Unit 3-Story Multi-Family Apartment Building (for the elderly) with associated parking, landscaping and drainage.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 12/10/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0925-00236
Permite Description: 100 Unit 3-Story Multi-Family Apartment Building (for the elderly) with associated parking, landscaping and drainage.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | N/A | Partial Pass | Rough cut of stormwater basin in SW corner has begun and is accurate in location and depth. | |
| 05/29/2026 | ENGR - Drainage Structures | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0925-00236
Permit Description: 100 Unit 3-Story Multi-Family Apartment Building (for the elderly) with associated parking, landscaping and drainage.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2026 | NPPO Pre-Construction | Passed | Nursery will be located at SE of Site in a protected area that is already at correct grade and has access to irrigation. Nursery and Plants will checked again when moved. 3/13/26 Trees have not been transplanted yet. 5 Palo Verde and 5 Mesquites are tagged For TOS- 1 more than required. PIP 1 and 2 do not exist. 23,24,25 and 27 are located in a large basin. These trees will have to be mitigated 2 Palo verdes and 4 Mesquite in the landscape in addition to proposed landscaping. Request NPPO monitoring inspection after mercury is complete. |
|
| 03/13/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Inspections Needed: Grading Paving Striping Sidewalks flat work Drainage Structures (Swales etc.) Striping Refuse Enclosure Landscaping Request inspections for details on the DP, anything with reinforcing. Request Storm Water initial inspection ASAP to begin grading. |
|
| 08/17/2026 | SITE - Stormwater Setup and Controls | Passed | Storm Water Initial inspection completed previously. -Stormwater biweekly inspections need to be set up. -Add wattle across potential outflow to basin at southeast corner of site. Currently it looks like storm water would flow into the adjoining basin on other side of fencing. Recondition or add rock to the Trackout at construction entrance. Rock is getting compacted and not functioning as designed. -It has been 30+ days since last routine SWPPP inspection. You should be occurring every two weeks or after a Storm event during monsoon season. Otherwise site BMP's are okay |