Permit: TD-DEV-0924-00254
Permit Details
Apply Date:
09/11/2024
Applicant:
Eduardo Alvarado
Description:
Installing Tesla Supercharging Station within existing parking lot. Project will include accessible parking area, electrical equipment, transformer, (12) charging posts
Permit Reviews
Permit Number - TD-DEV-0924-00254
Permit Status: Inspections
Permit Description: Installing Tesla Supercharging Station within existing parking lot. Project will include accessible parking area, electrical equipment, transformer, (12) charging posts
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2024 | DEVELOPMENT PACKAGE NEW v.1 | 09/13/2024 | REQUIRES RESUBMIT |
| 09/23/2024 | DEVELOPMENT PACKAGE NEW v.2 | 09/23/2024 | REQUIRES RESUBMIT |
| 01/31/2025 | DEVELOPMENT PACKAGE NEW v.6 | 02/20/2025 | APPROVED |
| 11/04/2024 | DEVELOPMENT PACKAGE NEW v.5 | 01/03/2025 | REQUIRES RESUBMIT |
| 09/24/2024 | DEVELOPMENT PACKAGE NEW v.3 | 10/02/2024 | REQUIRES RESUBMIT |
| 11/01/2024 | DEVELOPMENT PACKAGE NEW v.4 | 11/01/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00254
Permite Description: Installing Tesla Supercharging Station within existing parking lot. Project will include accessible parking area, electrical equipment, transformer, (12) charging posts
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | N/A | Partial Pass | 2/3/26 10 supercharger foundations cast in place per detail C-2 on page C201 1 double cast in place foundation per detail B-1 on page C203 Forms are correct, 6" ABC compacted with Jumping Jack and filter fabric in place correct. 4 #5 hors w/ 5 #4 ties. They are adjacent to existing curb, and in line with new curb that will be poured. -double foundation placed between 2 10.5' parking spaces. Forms layed out to plan and detail. Okay to pour forms Small section of sidewalk in island ready for pour. 6” wire remesh per detail placed. Okay to pour sidewalk Schedule inspection for paving, striping, and light pole footers |
|
| 05/20/2026 | ENGR Paving | N/A | Failed | The handicap parking area is noncompliant needs to remove the asphalt in that area and repave it |
| 05/20/2026 | ENGR Engineering Final | N/A | Failed | The handicap parking area is noncompliant needs to remove the asphalt in that area and repave it |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00254
Permit Description: Installing Tesla Supercharging Station within existing parking lot. Project will include accessible parking area, electrical equipment, transformer, (12) charging posts
Total Completed Inspections - 1