Permit: TD-DEV-0824-00238
Permit Details
Apply Date:
08/19/2024
Applicant:
Arturo Nunez
Description:
Restricted Access-This project consists of site development to support an upcoming TI package on behalf of El Rio Health for Meridian Property Company, for the renovation of the existing 2-story, 91,578sf building for an El Rio Health Clinic. It includes additional parking and landscaping and site utility coordination, as well as a new Pharmacy Drive-Thru. Refer to Planning Case #TC PRE-0424-00096
Permit Reviews
Permit Number - TD-DEV-0824-00238
Permit Status: Complete
Permit Description: Restricted Access-This project consists of site development to support an upcoming TI package on behalf of El Rio Health for Meridian Property Company, for the renovation of the existing 2-story, 91,578sf building for an El Rio Health Clinic. It includes additional parking and landscaping and site utility coordination, as well as a new Pharmacy Drive-Thru. Refer to Planning Case #TC PRE-0424-00096
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/24/2024 | DEVELOPMENT PACKAGE NEW v.2 | 12/05/2024 | REQUIRES RESUBMIT |
| 07/31/2025 | RFI v.1 | 08/12/2025 | APPROVED |
| 12/16/2024 | DEVELOPMENT PACKAGE NEW v.4 | 12/27/2024 | APPROVED |
| 12/06/2024 | DEVELOPMENT PACKAGE NEW v.3 | 12/13/2024 | REQUIRES RESUBMIT |
| 08/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 09/30/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TD-DEV-0824-00238
Permit Status: Complete
Permit Description: Restricted Access-This project consists of site development to support an upcoming TI package on behalf of El Rio Health for Meridian Property Company, for the renovation of the existing 2-story, 91,578sf building for an El Rio Health Clinic. It includes additional parking and landscaping and site utility coordination, as well as a new Pharmacy Drive-Thru. Refer to Planning Case #TC PRE-0424-00096
| Date | Description | Comments |
|---|---|---|
| 10/02/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT | |
| 07/31/2025 | Prior to final - needs review for requests for information, AS-Built will need to be submitted |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0824-00238
Permite Description: Restricted Access-This project consists of site development to support an upcoming TI package on behalf of El Rio Health for Meridian Property Company, for the renovation of the existing 2-story, 91,578sf building for an El Rio Health Clinic. It includes additional parking and landscaping and site utility coordination, as well as a new Pharmacy Drive-Thru. Refer to Planning Case #TC PRE-0424-00096
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | N/A | Partial Pass | Contractors good to pour the lightbulb basins |
| 10/27/2025 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0824-00238
Permit Description: Restricted Access-This project consists of site development to support an upcoming TI package on behalf of El Rio Health for Meridian Property Company, for the renovation of the existing 2-story, 91,578sf building for an El Rio Health Clinic. It includes additional parking and landscaping and site utility coordination, as well as a new Pharmacy Drive-Thru. Refer to Planning Case #TC PRE-0424-00096
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2025 | Consultation SITE | Passed | Consultation went well, all underground electrical to light poles I've seen with tracer wire on the west exterior section of the parking lot. | |
| 03/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | I informed the contractor to call in every two weeks for the swap inspections and that we need all the materials tested and the results on site | |
| 04/22/2025 | Passed | |||
| 06/26/2025 | Passed | |||
| 07/31/2025 | ENGR - Drainage Structures | Passed | ||
| 09/11/2025 | For trash and recycling enclosures | Passed | Trash enclosure is complete to approved plan details. Finish condition is passed. | |
| 10/09/2025 | Passed | |||
| 10/09/2025 | Passed | |||
| 10/09/2025 | Passed | |||
| 10/09/2025 | ENGR Paving | Passed | ||
| 10/24/2025 | ENGR Engineering Final | Passed |