Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 04/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractor and I had a conversation over the catch basins that they’re going to form. I looked at three of them. They needed to be compacted. They don’t need to have another test on them. Just react to clean out before they start forming and concrete. |
| 04/22/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors good pour all five catch bases |
| 06/04/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors excavating for two catch basins on the south side of the building. Good to form contract. Will also give you a call with the finish, forming up the bases before they pour. |
| 06/26/2025 |
ENGR - Drainage Structures |
|
Passed |
|
| 07/31/2025 |
ENGR - Drainage Structures |
|
Passed |
|