Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
08/31/2023
Applicant:
Ben Irwin
Description:
Coffee Shop w/Drive Thru

Permit Reviews

Permit Number - TD-DEV-0823-00380
Permit Status: Issued
Permit Description: Coffee Shop w/Drive Thru
Start Date Submittal Complete Date Status  
07/14/2025 AS-BUILT v.1 07/23/2025 APPROVED Review Details
09/01/2023 DEVELOPMENT PACKAGE NEW v.1 10/25/2023 REQUIRES RESUBMIT Review Details
08/27/2024 DEVELOPMENT PACKAGE NEW v.1 09/13/2024 APPROVED Review Details
04/22/2024 DEVELOPMENT PACKAGE NEW v.2 08/19/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0823-00380
Permite Description: Coffee Shop w/Drive Thru
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/07/2025 SITE - Zoning Final N/A Not Applicable
08/13/2025 Consultation SITE N/A Not Applicable
07/25/2025 For trash and recycling enclosures N/A Partial Pass Record of inspection from Terracon needs to be submitted to the permit
08/13/2025 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0823-00380
Permit Description: Coffee Shop w/Drive Thru
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/16/2024 PDSD Engineering Division Pre-Construction SITE Passed
08/06/2025 Passed
08/13/2025 ENGR Paving Passed
08/13/2025 LAND Landscape Appearance & Function Final Passed
09/05/2025 For trash and recycling enclosures Passed

Documents

File Name Document Type  
APPROVED AS-BUILT1_PLAN SET - B-IV - 7BREW - DP-REV2 - 2025-07_11_V1 TD-DEV-0823-00380 (1).PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT - 7 BREWS COFFEE AT THE BRIDGES - DRAINAGE STATEMENT - 2023-06-01_V1.PDF DOCUMENTS VIEW
1_GEOTECH REPORT - 23-041 SEVEN BREW TUCSON MARKETPLACE, RICK ENGINEERING_V1.PDF DOCUMENTS VIEW
1_SWPPP - 7 BREW BRIDGES B-IV - 2023-08-14_V1.PDF DOCUMENTS VIEW
2_DRC APPROVAL.7BREW_V1.PDF DOCUMENTS VIEW
APPROVED AS-BUILT1_PLAN SET - B-IV - 7BREW - DP-REV2 - 2025-07_11_V1 TD-DEV-0823-00380 (1).PDF DOCUMENTS VIEW
APPROVED RESPONSE LETTER.PDF DOCUMENTS VIEW
AS-BUILT1_AS-BUILT LETTER - RE REVISION 2 UPDATES - 2025-07-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PERMIT TD-DEV-0823-00380 _ FILE NAME 1_PLAN SET - B-IV - 7BREW - DP - 2023-07-21 - COMBINED_V1.PDF _ DOC TYPE PLANS UNDER REVIEW.PDF DOCUMENTS VIEW
TD-DEV-0823-00380 2ND COMMENT LETTER 05.10.24.PDF DOCUMENTS VIEW
TD-DEV-0823-00380 COMMENT LETTER 10.03.23 (1).PDF DOCUMENTS VIEW
TD-DEV-0823-00380 COT PERMIT CARD.PDF DOCUMENTS VIEW
TEP MAP.PDF DOCUMENTS VIEW
REV1_1_REVISION LETTER - 7 BREW AT THE BRIDGES SUB-AREA B-IV - 2024-08-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
STAMPED REV1_1_PLAN SET - B-IV - 7BREW - DP - REV1 - 2024-08-22_V1.PDF DOCUMENTS VIEW
5356-DPP-LANDSCAPE-SHEETS_2024-9-13_V1.PDF DOCUMENTS VIEW
REV1_1_PLAN SET - B-IV - 7BREW - DP - REV1 - 2024-08-22_V1.PDF DOCUMENTS VIEW
APPROVED 2_PLAN SET - B-IV - 7BREW - DP - 2023-03-13_V2.PDF DOCUMENTS VIEW
TD-DEV-0823-00380 COT PERMIT CARD.PDF DOCUMENTS VIEW
TD-DEV-0823-00380 2ND COMMENT LETTER 05.10.24.PDF DOCUMENTS VIEW
2_PLAN SET - B-IV - 7BREW - DP - 2023-03-13_V2.PDF PLANS UNDER REVIEW VIEW
2_COMMENT RESPONSE - 7 BREW BRIDGES B-IV - CRL - DP - 1ST SUBMITTAL - 2024-03-13_V1.PDF PLANS UNDER REVIEW VIEW
APPROVED RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP MAP.PDF DOCUMENTS VIEW
PERMIT TD-DEV-0823-00380 _ FILE NAME 1_PLAN SET - B-IV - 7BREW - DP - 2023-07-21 - COMBINED_V1.PDF _ DOC TYPE PLANS UNDER REVIEW.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT - 7 BREWS COFFEE AT THE BRIDGES - DRAINAGE STATEMENT - 2023-06-01_V1.PDF PLANS UNDER REVIEW VIEW
1_GEOTECH REPORT - 23-041 SEVEN BREW TUCSON MARKETPLACE, RICK ENGINEERING_V1.PDF PLANS UNDER REVIEW VIEW
1_PLAN SET - B-IV - 7BREW - DP - 2023-07-21 - COMBINED_V1.PDF PLANS UNDER REVIEW VIEW
1_SWPPP - 7 BREW BRIDGES B-IV - 2023-08-14_V1.PDF PLANS UNDER REVIEW VIEW