Permit: TD-DEV-0723-00334
Permit Details
Apply Date:
07/25/2023
Applicant:
JULIE COMBS
Description:
Watermill Express kiosks are free standing, unmanned water & ice vending stations positioned primarily in two, leased shopping plaza parking spaces. Each kiosk is a fully premanufactured unit that has been inspected, approved, and stamped at the state level, leaving only the foundation and plumbing & electrical connections reviewable and inspected on the local level.
Permit Reviews
Permit Number - TD-DEV-0723-00334
Permit Status: Complete
Permit Description: Watermill Express kiosks are free standing, unmanned water & ice vending stations positioned primarily in two, leased shopping plaza parking spaces.
Each kiosk is a fully premanufactured unit that has been inspected, approved, and stamped at the state level, leaving only the foundation and plumbing & electrical connections reviewable and inspected on the local level.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2023 | DEVELOPMENT PACKAGE NEW v.3 | 11/29/2023 | REQUIRES RESUBMIT |
| 01/29/2024 | DEVELOPMENT PACKAGE NEW v.4 | 02/15/2024 | REQUIRES RESUBMIT |
| 10/24/2024 | DEVELOPMENT PACKAGE NEW v.5 | 12/06/2024 | APPROVED |
| 08/24/2023 | DEVELOPMENT PACKAGE NEW v.2 | 09/25/2023 | REQUIRES RESUBMIT |
| 07/27/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/28/2023 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0723-00334
Permit Description: Watermill Express kiosks are free standing, unmanned water & ice vending stations positioned primarily in two, leased shopping plaza parking spaces.
Each kiosk is a fully premanufactured unit that has been inspected, approved, and stamped at the state level, leaving only the foundation and plumbing & electrical connections reviewable and inspected on the local level.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-construction meeting was called after the project was completed. Project is complete in accordance with approved plans. |