Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0723-00296
Permit Details
Apply Date:
07/05/2023
Applicant:
Description:
Site Development Package for new Indoor Storage Facility
Permit Reviews
Permit Number - TD-DEV-0723-00296
Permit Status: Issued
Permit Description: Site Development Package for new Indoor Storage Facility
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/12/2023 | DEVELOPMENT PACKAGE NEW v.3 | 01/16/2024 | APPROVED |
06/25/2024 | DEVELOPMENT PACKAGE NEW v.4 | 07/24/2024 | REQUIRES RESUBMIT |
09/12/2024 | DEVELOPMENT PACKAGE NEW v.5 | 09/18/2024 | APPROVED |
08/24/2023 | DEVELOPMENT PACKAGE NEW v.2 | 09/27/2023 | REQUIRES RESUBMIT |
07/06/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/10/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0723-00296
Permite Description: Site Development Package for new Indoor Storage Facility
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/29/2024 | ENGR - Drainage Structures | N/A | Partial Pass | Contractors forming up catch basins one on the west side one on the east side and they are going to form up some head walls on the north end of the project. Josh Garcia inspected the 32 inch RCP pipe off of the catch basins. |
12/17/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Informed the contractor that he needs to call in the stormwater every two weeks. And for the other inspections that he has on his inspection cards as needed. |
01/22/2025 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | I am for the contractor that they need to put riprap at the bottom of that 32 inch storm drain pipe and backfill the wing walls |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0723-00296
Permit Description: Site Development Package for new Indoor Storage Facility
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | I advised the contractor to call in every two weeks for swept and call Lynn as needed for inspections. Today they’re going to pour to catch basins the one on the west side of the building and one on the east side of the building. Contractor will call me when they head walls are ready to be inspected. |
Scheduled Inspections
Scheduled Inspections - TD-DEV-0723-00296
Status: Issued
Description: Site Development Package for new Indoor Storage Facility
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
01/02/2025 | SITE - Stormwater Setup and Controls | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.