Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 10/29/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors forming up catch basins one on the west side one on the east side and they are going to form up some head walls on the north end of the project. Josh Garcia inspected the 32 inch RCP pipe off of the catch basins. |
| 11/01/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
okay to pour headwalls |